Construction Work – Construction Works – Expansion And Reconstruction Of The Princes Czartoryski Library. 1. The Subject Of The Order Are Construction And Installation Works As Part Of The Task Expansion And Reconstruction Of The Princes Czartoryski Library, Ul. Saint Marka 17, Kraków. 2. As Part Of The Execution Of The Order, The Contractor Is Obliged To Obtain An Occupancy Permit After Notifying The District Construction Supervision Inspectorate In Krakow About The Completion Of Construction. 3. The Contractor Is Obliged To Carry Out The Works In Accordance With: - Draft Agreement (Annex No. 5 To The Swz), - Annex. 2A To Swz - Employers Guidelines For The Implementation Of Construction Works - Annex. 2B To Swz - Design Documentation (Construction Design, Technical Designs - Executive With Errata, Bills Of Quantities) - Annex. 2C To Swz - Technical Specifications For The Execution And Acceptance Of Works, - Annex. 2D To Swz - Museum Standard For It Structured Cabling Systems And Technical Building Systems, - App. 2E To Swz - Permits (For Construction, Decision No. 605/6740.2/2022 Of November 10, 2022, Conservation Permits: Decision No. Zn-I.5142.467.2021 Of March 8, 2022 And Decision No. Za.5161.39 .2023 Of 12/07/23 And Other Issued Decisions, Permits, Arrangements That Will Prove Necessary To Implement The Subject Of The Order And Applicable Legal Provisions) - Attachment. 2F To Swz – Part Covered By The Swz Confidentiality Clause - Executive Designs Of Low-Voltage Installations Along With Errates For These Projects 4. Equivalence In Relation To Standards And Technical Specifications. 1) Pursuant To Art. 101 Section 4 Of The Public Procurement Law If The Documents Describing The Subject Of The Contract Contain A Reference To Standards, European Technical Assessments, Approvals, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Section 1 Point 2) And Section 3) Pzp And Such References Were Not Accompanied By The Expression Or Equivalent, The Ordering Party Allows Solutions Equivalent To Those Described In Each Such Standard, European Technical Assessment, Approval, Technical Specification, Technical Reference System. In Connection With The Above, It Should Be Assumed That Each Standard, European Technical Assessment, Approval, Technical Specification, Technical Reference System Appearing In The Description Of The Subject Of The Contract Is Accompanied By The Words Or Equivalent. Including, If Any, Newer Equivalents Of The Indicated Standard, Subject To Point 3. 2) Pursuant To Art. 101 Section 5 And 6 Pzp, The Contractor Who Refers To Solutions Equivalent To Those Described By The Ordering Party Is Obliged To Demonstrate That The Supplies Or Construction Works Offered By Him Meet The Requirements Specified By The Ordering Party. 3) In The Event Of Offering Equivalent Standards Or Techniques For Carrying Out Construction Works, The Contractor Must, Together With The Offer Form, Demonstrate By Means Of Evidence That The Offered Standards Or Techniques For Carrying Out Construction Works Are Equivalent To The Solutions Indicated In The Procedure Documentation, I.E. One That Is Characterized By At Least Match The Main Parameters/Descriptions At The Level
|