Gas Supply Mains Construction Work – Establishment Of A Steel Pipeline At Frøslev-Terkelsbøl. The Biogas Production From Biogas Plants In Southern Jutland Cannot Be Sold In The Local Distribution Network Or Absorbed Into The Associated Steel System During The Summer. Therefore, A New Steel Pipeline Must Be Established To Transport Excess Biogas From Frøslev To Terkelsbøl. Construction Of The New Steel Pipeline Means That The Steel Pipelines 432 Will In The Future Be Physically Connected To The Steel Pipelines 429. Scope Of The Work The Construction Work Includes The Execution Of Approx. 17,700 Meters (Pipe Pit And Controlled Sub-Drilling) In Primarily Field Area, But Also Larger Peace Forest And Plantation Areas, Wetlands (§3) And A Natura 2000 Watercourse, Will Be Affected By The Construction Work. Welding Of Approx. 17,700 Meters Ø168.3 Mm Steel Pipeapprox. 3,553 Meters Of Under-Drilling Drilling Of Existing Steel Pipeline (Tdw)* In Frøslev Plantation As Well As Construction Of Valve And Scraper Arrangement Line Valve (About Halfway Along The Route) And Construction Of Valve Group Connection To Existing Valve Arrangement In Terkelsbøl At Energinets Mr Station As Well As Construction Of Valve And Scraper Arrangement.* Tdw Is Builders Delivery
Contact Information
Address
Vognmagervej 14
Contact No.
+45 62259000
Email
udbud@evida.dk
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 90547747
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.