Landscape Architectural Services – Complete Recultivation Of Mining Wells. Basic Order: 6 Unused Deep Drillings For Hydrocarbon Research Or Exploration Mining Purposes (Section 49 Of Act Xlviii Of 1993, Points 9, 17, 34, And 50) After Technical Liquidation, Complete, (Drilling Base, Breaking Up A Shaft, Transporting The Concrete Rubble And Handing Over The Concrete Rubble For Utilization, The Cultivation Of The Area Return) Mining Reclamation. During The Performance, The Following Works Must Be Carried Out In Total For The 6 Well Areas (The Quantities Given Are Estimated Data): - Construction, Repair, Strengthening And Restoration Of Access Road (700 Square Meters Of Road) - Excavation Of Concrete, Well Shafts, Removal And Placement Of Debris (1350 Compact M3) - Loading, Transportation, Placement Of Green Waste, Subsoil, Garbage (130 M3) - Acquisition, Delivery, Loading Of Agricultural Land (1,350 M3) - Landscaping (11,030 M2) - Agrotechnical Recultivation (11,030 M2) - Inspection Of The Basic Environmental Protection Condition, Sampling, With Laboratory Testing 12 (Pcs) - Laboratory Testing Of The Soil To Be Applied 6 Pcs - The Approach Restoring The Route (Plough/Meadow) To Its Original State (1640 Fm) - The Replacement Or Conversion Of The Pipe Head (Pipe Cutting, Pipe Cap Fabrication, Strain Gauge, Needle Valve Installation) Is Billed Based On The Actual Quantity. Quantitative Deviation: Complete Recultivation Of Max. 1 Further Unused Mining Borehole. During Construction, The Following Works Must Be Carried Out In Relation To The Well Area (The Given Quantities Are Estimated Data): • Construction, Repair, Strengthening, Restoration Of The Access Road (300 Road Square Meters) • Excavation Of Concrete, Well Manholes, Removal And Placement Of Debris (500 Solid M3) • Extraction Of Drilling Mud (Ewc 010505 Or Ewc 010506, Hazardous Waste), Transport To A Licensed Site (120 M3) • Acquisition, Delivery, Loading Of Agricultural Land (500 M3) • Landscaping (2800 M2) • Agrotechnical Recultivation (2800 M2) • Control Environmental Protection Basic Condition Test, Sampling, With Laboratory Test 2 (Pcs) • Soil To Be Applied Laboratory Inspection 1 Pc • The Approach Route (Arable Field/Meadow) To Its Original State (100 Fm) • Replacement Or Transformation Of The Pipe Head (Pipe Cutting, Pipe Cap Fabrication, Strain Gauge, Needle Valve Installation) Is Billed Based On The Actual Quantity. The Quantity Deviation Will Be Called In The Event That Aks Coverage Also Provides Coverage For The Ordering Of These Tasks. A Detailed Description Of The Tasks Can Be Found In The Public Procurement Documentation.
|