Tramway Platforms Construction Work - Viadukt Renovation Construction Work. The Contractors Task Is To Implement The Technical Content Included In The Viaduct Plan Package, To Ensure The Connection To The Current State With An Overlay Plan, For Which Bkk Recommends Using The Plan Documentation Issued As A Help After Assessing The Current State. In Addition, In Order To Maintain The Traffic Of Tram 2 Until March 15Th, Its Task Is To Install A Temporary Track Connection, Which Must Also Be Connected To The Existing State Based On The Published Plans. The Investment Is A Permit-Required Activity, The Relevant Project, Issued By The Department Of Railway Authority Of The Ministry Of Innovation And Technology With File Number Vhf/945-02/2021-Itm “Bp. The Bidder Made Available The Decision Permitting The Reconstruction Of The Viaduct Between Tram Line 2, Eötvös Tér And Petőfi Tér (Permit) And The Decision Of The Heritage Protection Authority That Is Part Of It In The Issued Plan Documentation. The Contractor Must Pay Special Attention To The Requirements Of The Specialized Authority In Connection With The Work Carried Out On The World Heritage Site, On The Main Flood Protection Line. Ordering The Specialist Supervision Included In The Contributions Is The Responsibility Of The Contractor. The Art Object Is Under The Protection Of The Office Of Cultural Heritage Protection, Is Protected As A Monument And Archeology On The Basis Of Heritage Protection Legislation, And Has A Steel And/Or Forged Iron Load-Bearing Structure. The Artefact Included In The Given Topographical Number Is Under Monument Protection, The Main Number(S) Of Its Monument Protection Are 16288, 15001, The Main Number Of Its Archaeological Protection Is: 66154, The Main Number Of Its World Heritage Protection Is 30479. The Task Also Includes The Renovation Of The 463 M Long Viaduct, According To The Provisions Of The Technical Disposition. Main Tasks: - Implementation Of The Content Of The Viaduct Plan Package (Reconstruction Of The Tramway, Renovation Of The Building With A Riveted Steel Load-Bearing Structure, Protected As A Monument, Archeology And World Heritage According To Heritage Protection Rules, Renovation Of The Plastered Facade And Connecting Stone-Faced Flood Protection Retaining Walls That Are Part Of The Building, Barrier-Free Platform, Drainage, Corrosion Protection Etc.) - Reconstruction Of The Platforms Of The Eötvös Tér Stop (Removal Of Obstacles) And Ensuring The Connection To The Existing Condition - Installation Of A Temporary Track Connection At March 15Th Square - Provision Of Platform Lighting With Public Lighting Poles - Ensuring The Connection Between The Track Connection And The Viaduct Plan Package Based On The Disposition 3.5 Of The Draft Contract. To Fulfill The Tasks Included In Point 1 As Follows: - Extension Of Public Utility Approvals, Public Utility Contributions, As Well As Initiating The Procurement Of Missing Public Utility Contributions; - Examination Of Connection Points In Connection With Downtown Projects Completed Since The Delivery Of The Basic Plans. The Contractors Task Is To Ensure That The Connection To The Current State Meets The Requirements Set Out In The Technical Description
Contact Information
Contact No.
+36 307741256
Email
kozbeszerzes@bkk.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 90506789
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.