Road Construction Works – Construction Of The Złocieniec Bypass Along National Road No. 20. The Task Will Consist In The Construction Of A Single-Lane Złocieniec Bypass With A Length Of Approx. 7.85 Km Along National Road No. 20 Along With Accompanying Infrastructure In The Design And Build System. Within The Accepted Contract Amount, The Following Works Should Be Designed And Performed, In Particular: 1. Construction Of The Dk20 Road (Złocieniec Bypass) From Km 0+000 To Km 7+848.32 (Km In Accordance With The Program Concept), Taking Into Account The Scope Of Necessary Connections To The Sections Adjacent Existing Roads, Along With Their Possible Reconstruction And Changes In Traffic Organization Resulting From The Adopted Solutions, 2. Construction Of 4 Intersections Roundabout Type, Including 2 At Connections With The Existing Course Of Dk20, 3. Reconstruction Of Existing Roads In The Scope Of Collisions With The New Course Of The Dk20 National Road, 4. Construction Of Roads Other Than The National Road, Including Changing The Course Of Existing Roads, In Order To Restore The Damaged Ones Road Connections Or Providing Access To The Property, 5. Construction Of Additional Roads, Located In The Road Area Of The New And/Or Existing Section Of The Dk20 National Road, 6. Construction And Reconstruction Of Infrastructure For Pedestrians And Cyclists, 7. Two Collision-Free Intersections Of A National Road With A Railway Line - The Intersections Should Be Constructed In Accordance With The Applicable Regulation On The Technical Conditions To Be Met By Intersections Of Railway Lines And Railway Sidings With Roads And Their Location [6] , And Technical Conditions For Railway Engineering Facilities Id-2 (D2) Pkp Plk [144], 8. Exits, Entrances And Exits, 9. Service Lanes - Not Applicable, 10. Engineering Structures Along The National Road And Along The Roads Intersecting With The National Road, 11. Area Drainage System, Including Road Body Drainage Devices: Road Ditches, Rainwater Drainage, Pre-Treatment Devices, Tanks Retention, Retention And Infiltration And Others, 12. Environmental Protection Devices, In Particular: Animal Crossings, Ecological Culverts With Fencing Protection And Guidance, Tank Fencing, Greenery, Replacement Tanks For Amphibians, Etc., 13. Removal From The Construction Site And Disposal Of All Identified Plants That Are Invasive Alien Species, 14. Removal From The Construction Site And Disposal Of Waste Identified In Previously Prepared Documentation, 15. Infrastructure For Facilities Located Near/Along The National Road, Including: Power Supply And Lighting Networks, Storm Sewage System With Devices Pre-Treatment And Other As Needed, 16. Reconstruction Of Conflicting Devices And Networks Of Existing Underground And Above-Ground Infrastructure: Telecommunications And Energy Devices, Water Supply Networks, Rainwater And Sewage Disposal Systems, Gas Networks, Drainage And Hydrological Devices, Railway Devices And Networks And Others In As Needed, 17. Demolition Of Buildings And Structures, Demolition Of Road Elements, Culverts And Others, 18. Telephone Network
|