Construction Work – Reconstruction And Modernization Of Street Lighting In Strelcha Municipality. The Subject: Reconstruction And Modernization Of Street Lighting In Strelcha Municipality. Category: Third Group, Third Category According To Art. 137 Of The Zut. Building Permit No. 46 Dated 18.10.2022 Has Been Issued For The Site. Objective - Reconstruction And Modernization Of Street Lighting On The Territory Of The Municipality Of Strelcha, This Includes The Town Of Strelcha, Village Dyulevo, Village Smilets, Village Blatnitsa And Village Svoboda, Strelcha Municipality. According To A Generalized Quantitative Account For The Entire Municipality (Town Of Strelcha, Village Of Blatnitsa, Village Of Dyulevo, Village Of Smilets, Village Of Svoboda): Dismantling Of Old Street / Park / Lighting Fixture Is Planned - 1050 Pcs. Dismantling Of Non-Insulated Wires - 2440 M, Dismantling Of Old Brackets/Slingshots/ - 985 Pcs.; Delivery And Installation: - Of 998 Pcs. Led Street Lighting Fixture Led 23W, - 275 Pcs. Led Street Lighting Fixture Led 35W, - On 123 Led Street Lighting Fixture Led 50W, - On 41 Led Street Lighting Fixture Led 68W. Installation Of New Led Street Lighting 1437 Pcs.; Installation Of An Existing Led Street Light 50W - 12 Pcs. Delivery Of Led Park Lighting Unit Led 10W - 48 Pcs. Delivery Of Led Park Lighting Unit Led 25W - 89 Pcs. Installation Of Led Park Lighting - 137 Pcs. Delivery Of Led Spotlight Led 44W - 4 Pcs. Delivery Of Led Spotlight Led 67W - 6 Pcs. Installation Of Led Spotlight - 10 Pcs. Delivery Of Led Moon, For Embedding In Flooring Led 7W - 13 Pcs. Installation Of An Led Moon Embedded In The Flooring - 13 Pcs. Delivery And Installation Of A Control System For The Management Of The Ua - Delivery And Installation Of 30 Pcs. Control Panel, Delivery And Installation Of A New Control Panel With Controller - 30 Pcs., Computer + Control Software - 1 Pc., Setup And Commissioning Of The Control Panel - 30 Pcs., Setup And Commissioning Of The System - 1 Pc. Cables, Terminals, Poles And Fastening Elements: Dismantling Of 2440 M Of Non-Insulated Wire, Dismantling Of 958 Pieces Of Old Brackets/Slingshots, Delivery And Installation Of 26400 M Of Iup 2X16mm2 + Fittings, Delivery And Installation Of 182M Of Iup 4X16mm2 + Fittings, Delivery And Laying On 1090 M Installed Pipe F40, Delivery And Laying Of 1090 M Of Cable 3X4 Mm2, Cutting Of 200 M. Paving With A Fugue Cutter, Excavation And Restoration /Tiles, Concrete/ Of 50M2 Pavement, Making Of 780M. Excavation 0.8/0.4M, With Digging And Tamping, Delivery And Installation: - On A Steel Tubular Pole H=9M - 14 Pcs. - On A Tubular Steel Pole H=7M - 17 Pcs. - On A Tubular Steel Pole H=4M - 40 Pcs. Delivery And Installation Of Tuo - Metal Cabinet, For Installation Of Sbs, With Dimensions 300/200/150 Mm + Fuses - 4 Pcs. Delivery And Installation Of Small Console - 0.3 M - 1124 Pcs. Delivery And Installation Of A Large Console - 1.5 M - 322 Pcs. Delivery And Withdrawal Of Svt Cable 2X1.5 Mm2 - 3162 M. Delivery And Installation Of Bimetallic Terminals - 1908 Pcs.
|