3 Nos. Circular Gazebo Hut Construction At Love-Kush Vatica Kalaghata; 1 Earth work in rough excavation, banking excavated earth inlayers not exceeding 20cm in depth, breaking clods watering, rolling each layer with 1/2 tonne roller, or stone or steelrammers and rolling every 3rd and top- most layer with power roller of minimum 8-10 tonne capacity and dressing up in embankment for roads, flood banks marginal banks and guide banks or filling up ground depressions, lead up to 50 Mtr. and lift up to 1.5 Mtr.:All kinds of soil 2 Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excludingthe cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). 3 Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for :Columns, pillars, posts and struts etc. 4 Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level.("Original producers" who manufacture billet directly fromiron ores and roll the bilets to produce steel conforming toIS:1786) Hot rolled deformed bars (IS : 1139). 5 Providing and laying in position specified grade of cement concrete for all RCCstructural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if Required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix / Design Mix 6 Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement for Beams, suspended floors, roofs, griders having slopes up to 15º, landings, balconies, shelves, chajjas, lintels, bands, plain windows sills, staircases and spiral staircases etc. M20 grade Nominal Mix / Design Mix 7 Brick masonry with F.P.S. bricks of class designation 75 in foundation and plinth with bricksCement mortar 1 : 4 (1 cement : 4 coarse sand) 8 Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for : Suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, bands, coping bed plates, anchor blocks, sills, chhajjas, lintel, beam, plinth beam etc. 9 Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement for Arches, arch ribs, domes, vaults, shells, folded plate, chimneys, shafts , roofs having slope more than 15º ,vertical and horizontal finsindividually or forming box louvers, facias and eaves boards M20 grade Nominal Mix / Design Mix 10 Plaster on new surface on wall in cement sand mortar 1:3including racking of joints etc. complete fine finish : 25 mm thick 11 Providing and fixing ornamental/aesthetic look cement concerte claddings/ veneers up to 100 mm with, over a base of cement Plaster 1:4, 20 mm thick including cement pointing 1:2with an admixture of pigment to match the shades of veneer upto 4:5 mtr. Height above plinth level. 12 Finishing walls with textured exterior paint of required shade as per approved colour complete as per manufacturersspecifications including primer coat and protecting coat including scaffolding and safety provision Trowel Finish av. thickness 1000 to 1200 microns.
|