Mobilization And Demobilization, Construction Administration, Rental Of Container 2, 30 , Type Siding For Signage, Rectangular Mesh, Roll 1.20 50 M (L Equal To 0.40 M.Af_05/2018, Loading, Maneuvering And Unloading Soils And Granular Materials In 10 M³ Dump Truck - Loading With Hydraulic Excavator (1.20 M³ Bucket / 155 Hp) And Free Unloading (Unit: M3). Af_07/2020, Transport With 10 M³ Dump Truck, On Paved Urban Road, Dmt Up To 30 Km (Unit: M3xkm). Af_07/2020 - Dmt 17 Km, Supply And Installation Of Work Sign With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Planialtimetric Topographic Survey 1 To 5 Hectares, Mechanized Trench Excavation With Prof. From 3.0 M To 4.5 M (Average Upstream And Downstream/One Composition Per Section), Excavator (1.2 M3), Width 1.5 M To 2.5 M, In Soft Soil, In Locations With High Level Of Interference, Dismantling 3Rd Category Material (Rock Blocks Or Matacos), In A Trench, Using A Manual Pneumatic Hammer - Exclusive Removal, Loading And Transport. Af_03/2021, Removal Of 3Rd Category Material (After Excavation/Dismantling) In Trenches, With Hydraulic Excavator - Exclusive Cargo And Transport. Af_03/2021, Ballast With Granular Material (Crushed Stone N.1 And Crushed Stone N.2), Applied On Floors Or Slabs On Ground, Thickness Of *10 Cm*. Af_07/2019, Ballast With Granular Material (Rachão Stone), Thickness Of *10 Cm*. Af_01/2024, Execution And Compaction Of Base And Or Sub Base For Rachão Stone Paving - Exclusive Cargo And Transport. Af_11/2019, Manufacture, Assembly And Disassembly Of Formwork For Radier, Concrete Floor Or Slab On Ground, In Sawn Wood, 4 Uses. Af_09/2021, Frame For Execution Of Radier, Using Q-196 Screen, Transport With 6 M³ Dump Truck, Dmt Up To 30 Km (Unit: M3xkm). Af_07/2020, Assembly And Disassembly Of Formwork For Rectangular Pillars And Similar Structures, Simple Right Foot, 4 Uses. Af_09/2020, Concreting Of Pillars, Fck = 25 Mpa, Using A Pump - Laying, Densifying And Finishing. Af_02/2023, Pre-Molded Reinforced Concrete Closed Cellar/ Gallery, Internal Quadrangular Section Of 3.00 X 3.00 M (W X H), Corbel Of 20 45 E Fck Of Concrete = 30 Mpa Supply And Laying, Maneuver And Unloading Concrete Pipes, Dn 1200 Mm, In Truck Body With Crane (Munck) 11.7 Tm. Af_07/2020, Radier Concreting, Fck 30 Mpa - Laying, Densification And Finishing. Af_09/2021, Assembly And Disassembly Of Formwork For Baldrame Beam, E=25Mm, 4 Uses. Af_06/2017, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 5.0 Mm Ca-60 Steel - Assembly. Af_06/2022, Frame Of Pillar Or Beam Of Conventional Reinforced Concrete Structure Using Steel Ca-50 Of 10, Concreting Of Beams And Slabs, Fck=25 Mpa, For Precast Slabs Using A Pump - Laying, Densification And Finishing, Rockfilling With Cracking, Regularization And Compaction Of Predominantly Clayey Soil Subgrade. Af_11/2019, Execution And Compaction Of Base And Or Sub-Base For Paving Simple Graded Brite Treated With Cement - Exclusive C
|