Scope Of Construction In 2025: Pipe Replacement Az125 On Da180 Pe Length 272 Running Meters, Installation Of Ventilation Option Pe 1 Length 4 Running Meters; Pipe Replacement Föhrenwald Pvc100 On Da125 Incl. A Hydrant Connection Pe Length 122 Running Meters; Connection For Pipe Replacement Oberweidach Az100 On Da180 Pe Length 20 Linear Meter; Pipe Replacement Branch Line From Az100 To Da90 Pe Length 30 Linear Meters; Reconnection 14 House Connections Pe 1 Or 2 Length 39.0 Linear Meters; Preliminary Road Repair To Trench Width. Construction Scope 2026: Pipe Replacement From Az100 To Da18 Pe Length 373 Linear Meters Including Flushing Hole Seebach Bridge Dn300 With Additional Insertion Of 3 Cladding Pipes, Construction Of Tiroler Hof Da90 Pe Branch Line, Length 14 M; Construction Of Two Hydrant Connection Lines Da125 Pe Length 20 M, Reconnection Of Three Distribution Lines Da125 Pe Length 32 M; Reconnection Of 18 House Connections Pe 1 Or 2 Length 39.0 Linear Meters; Preliminary Road Repairs To Trench Width.
Contact Information
Contact No.
+43521462050
Email
office@passer.at
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 90332730
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.