Construction Work – Reconstruction And Expansion Of The Municipal Mechanical-Biological Sewage Treatment Plant In Sztum. The Subject Of The Order Is The Reconstruction And Expansion Of The Municipal Mechanical And Biological Sewage Treatment Plant In Sztum. The Task Will Include The Reconstruction Of The Sewage Treatment Plant Area Through The Construction Of A New Technological Building, The Demolition And Construction Of An Administrative And Technical Facility In A Different Location, And The Construction Of New Facilities Operating With Improved Technology, While Connecting Currently Used Networks To Them And Decommissioning Currently Used Buildings And Equipment. The Following Rooms Are Planned To Be Separated In The Technological Building: Mechanical Sewage Treatment Installation, Blower Station, Membrane Handling Installation, Hypochlorite Installation, Reagents, Sludge Dewatering, Containers For Dewatered Sludge. The Administrative And Technical Building Will House The Rooms Necessary To Service The Infrastructure Of The Treatment Plant And The Sewage Network (Catchment Point For Supplied Sewage, Pumping Station For Delivered Sewage And Own Sewage, Intermediate Pumping Station For Mechanically Treated Sewage, Retention And Averaging Tank, Intermediate Pumping Station For Averaged Sewage, Container Sewage Quality Measurement Installation). Cleaned, Tank For Emergency Discharge Of Floating Parts From The Retention And Averaging Tank, Sewage Separation Chamber For Biological Reactors, Biological Reactors, Sewage Separation Chamber From Biological Reactors To Membrane Chambers, Submersible Membrane Chambers, Recirculation Separation Chamber From Mbr, Sludge Stabilization Chamber, Container Installation For Measuring The Quality Of Treated Sewage, Lime Silo, Sewage Measuring Well, Container Filter Deodorization - Technological Device, Prefabricated Transformer Station, Power Generator In A Container Housing - Construction Device, Tank For Fire Protection Purposes, Dewatered Sludge Storage Shed, Pumping Station For Treated Sewage Intended For Cleaning Purposes (E.G. Watering Greenery), Pumping Station For Measuring Purified Sewage Intended For Cleaning Purposes (E.G. Watering Greenery), Pumping Station For Purified Sewage To Supply The Installation For Measuring The Quality Of Purified Sewage, Rainwater Pumping Station, Rainwater Retention Tank, Technological Pipelines In Buildings And Closed Rooms, Assembly 2 Pcs. . Heat Pumps With A Total Heating Power Of 58 Kw). Additionally, The Scope Of The Order Includes The Construction Of Internal Roads, Squares And Sidewalks, As Well As Planting Greenery.
|