Engineering Design Services – Schafhof Iv B New Construction Of Multi-Family Houses Project Management. For Further Information See Section 2.1 Procedure. The Property Is Located On The Schafhofäckern Northeast Of The City Center. Surrounded By Mostly Residential Buildings And The Westbach Kindergarten, The Property As A Planning Area Requires A Sensitive And Architecturally Integrative Approach. On The One Hand, The Requirements And Demands Of The Immediate Surrounding Area Should Be Taken Into Account And At The Same Time The Needs Of The New Housing Construction And Its Residents Should Be Taken Into Account. On The Other Hand, The Schafhof Ivb Property Should Also Accommodate A New Northern City Entrance To Kirchheim Unter Teck.// The Processing Area Includes A Portion Of Flst. 2336, 6494 And 6651 With Approx. 3856 M². And The Long Side Is Aligned With Zu Den Schafhofäckern.// The Municipal Housing Company Is Currently Holding A Competition For Architects And Landscape Architects To Develop The Property. The Final Jury Is Expected To Take Place On January 23, 2025.// As Part Of The Competition, Innovative Proposals For Cost-Effective Living Space In Modular And/Or Elemental Wooden Construction Are Sought. This Should Respond Sensitively And Appropriately To Urban Development And Functional Requirements.// The Municipally Planned Structural Measure Should Be Supported By The Rental Housing Financing “Housing Construction Bw – Social Rental Housing Promotion”. Therefore, The Associated Structural Requirements For Funding Must Be Taken Into Account And Ensured In Further Planning.// The Spatial Program For The Future Residential Development On Which The Implementation Competition Is Based Provides For A Maximum Gross Floor Area Of Approx. 4050 M². This Area Will Accommodate Several 1-Room Apartments, 2-Room Apartments, 3-Room Apartments And 4-Room Apartments, As Well As A Neighborhood Meeting Room And Other Technical, Utility And Ancillary Rooms. The Promoter Assumes An Open Construction With 3 Full Floors And A Maximum Building Height Of 10.00 M.// Sustainability: The Use Of Fossil Fuels Should Not Be Used In The Operation Of The Building. Renewable And Sustainable Energy Sources, On The Other Hand, Are Welcomed.// The Desired Energetic New Building Standard Plus Is Based On The Requirements Of The Funding For Rental Housing Financing. Further Information Can Be Found In The Bw Rental Apartment Financing Documents.// The Sponsor Wants A High Level Of Prefabrication And Therefore Expects A Short Construction Period And Economical Construction Of The Buildings. The Building Should Be Planned And Constructed Using Elemental And/Or Modular Timber Construction. Material-Appropriate And Economical Planning Is Required.// Life Cycle Costs: Structural And Technical Measures Should Be Used To Achieve An Optimized Ratio Of Investment Costs To Usage Costs. The Design Concept Must Take Into Account The Manufacturing, Operating And Maintenance Costs
Contact Information
Address
Marktstraße 14
Contact No.
07021502462
Email
bauverwaltung@kirchheim-teck.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 90330074
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.