Tender For C.C. Road From Jawahar's House To Punjilal's House Via The Pond Gp Pagara - Clearing of site, uprooting of roots, stems, vegetation, bushes, trees and saplings having stems upto 15 cm thick and removing of debris etc. "Cleaning of site, uprooting of roots, stems, vegetation, bushes, trees and saplings having stems upto 15 cm thick and removing of debris etc. 3 Laying of cement concrete for road foundation and operating needle and surface compacted machine and mixing broken aggregates with 40 mm crusher and preparing it in desired grade, camber and super elevation. "Laying of cement concrete for road foundation and operating needle and surface compacted machine and mixing broken aggregates with 40 mm crusher and preparing it in desired grade, camber and super elevation. "1:4:8 in 4 Mixing and pouring controlled concrete on the upper surface of cement concrete road and operating needle and surface vibrating machine (vibrator) and preparing it to a non-sliding surface, in desired grade, camber and super elevation! "Mixing and pouring controlled concrete on the upper surface of cement concrete road and operating needle and surface vibrating machine (vibrator) and preparing it to a non-sliding surface, in desired grade, camber and super elevation! "In 1:1.5:3 5 Excavation of soil upto 1.5 depth in foundation, trench, drain, tamping the bottom, watering, dressing the sides, taking out the excavated soil, filling up the empty spaces with soil again after filling the foundation and disposing the remaining soil upto a distance of 50 meters "Excavation of soil upto 1.5 depth in foundation, trench, drain, tamping the bottom, watering, dressing the sides, taking out the excavated soil, filling up the empty spaces with soil again after filling the foundation and disposing the remaining soil upto a distance of 50 meters "In hard, clayey, gravelly soil 6 Cement concrete Pouring and supplying reinforced cement concrete of 1:2:4/1:1.5:3 mixture, pressing in roof slabs, eaves, beams, lintels etc., tamping and leveling the surface Including scaffolding including levelling with 1:3 cement mortar etc. but cost of steel and shuttering separately. Supply and pouring of reinforced cement concrete of cement concrete 1:2:4/1:1.5:3 mix, pressing in roof slabs, eaves, beams, lintels etc., plastering and levelling of surface with 1:3 cement mortar etc. including scaffolding including but cost of steel and shuttering separately. Ratio 1:1.5:3
|