Tender For Annual Rate Contract Removal Leakage diffrence Size Pipe Line Under Uwss Sanchore - Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe lineup to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) In all type Soil AC/PVC/HDPE pipe50/63/75mm 2 80/90mm 3 100/110mm 4 125/140mm 5 150/160/180mm 6 200/225mm 7 250/280mm 8 300/315mm 9 350mm 10 400mm 11 450mm 12 500mm 13 Add on above item no. 1.1.1 for B.T. Road 14 Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15 Add on above no. 1.1.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 16 Add on above no. 1.1.1 item if depth of pipeline is above3.0 mtr. 17 Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and thenrefilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)In all type Soil80mm 18 100mm 19 125mm 20 150mm 21 200mm 22 250mm 23 300mm 24 350mm 25 400mm 26 450 mm 27 500 mm 28 600mm 29 Add on above item no. 1.2.1 for B.T. Road 30 Add on above item no. 1.2.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 31 Add on above no. 1.2.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 32 Add on above no. 1.2.1 item if depth of pipeline is above3.0 mtr. 33 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof andthen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) In all type Soil 50/63/75mm 34 80/90mm 35 100/110mm 36 125/140mm 37 150/160/180mm 38 200/225mm 39 250/280mm 40 300/315mm 41 350mm 42 400mm 43 450 mm 44 500 mm 45 600 mm 46 Add on above item no. 1.3.1 for B.T. Road 47 Add on above item no. 1.3.1 for C.C. Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 48 Add on above no. 1.3.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 49 Add on above no. 1.3.1 item if depth of pipeline is above3.0 mtr. 50 Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site andthen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) In all type Soil 80 mm 51 100 mm 52 125 mm 53 150 mm 54 200 mm 55 250 mm 56 300 mm 57 350 mm 58 400 mm 59 450 mm 60 500 mm 61 600 mm 62 Add on above item no. 1.4.1 for B.T. Road 63 Add on above item no. 1.4.1 for CC Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 64 Add on above item no. 1.4.1 if depth of pipe line is above 1.5 mtr to 3.0 mtr 65 Deduct on above item no. 1.4.1 if valve is fixed at plinth level / platform i.e. no excavation is required 66 Removal of Choking from pipe line, including tree roots, malba, sand and otherby manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material andthen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.In all type Soil 75 mm 67 90/80 mm 68 110/100 mm 69 140/125 mm 70 180/160/150 mm 71 225/200 mm 72 250 mm 73 300 mm 74 Add on above item no. 1.5.1 for B.T. Road 75 Add on above item no. 1.5.1 for CC Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 76 Add on above item no. 1.5.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 77 Add on above item no. 1.5.1 if depth of pipe line is above3.0 mtr. 78 Removal of Choking from pipe line, including tree roots, malba, sand and otherby manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material andthen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. In all type Soil 80 mm 79 100 mm 80 125 mm 81 150 mm 82 225/200 mm 83 250 mm 84 300 mm 85 Add on above item no. 1.6.1 for B.T. Road 86 Add on above item no. 1.6.1 for CC Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 87 Add on above item no. 1.6.1 if depth of pipe line is above 1.5 mtr up to 3.0 mtr. 88 Add on above item no. 1.6.1 if depth of pipe line is above 3.0 mtr 89 Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degreethen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour. 90 Add on above item no. 1.7 for B.T. Road 91 Add on above item no. 1.7 for CC Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 92 Add on above item no. 1.7 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 93 Removal of sluice valve in existing pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof andthen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)In all type Soil 80 mm dia pipe to 100mm 94 125 mm dia pipe to 150mm 95 200 mm dia pipe to 250mm 96 300 mm dia pipe to 350mm 97 400 mm dia pipe 98 450 mm dia pipe 99 500 mm dia pipe 100 600 mm dia pipe 101 Add on above item no. 1.8.1 for B.T. Road 102 Add on above item no. 1.8.1 for CC Road Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 103 Add on above item no. 1.8.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 104 Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof andthen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).In all type Soil 80 mm to 110 mm 105 125 mm to 165 mm 106 200 mm to 300 mm 107 Add on above item no. 1.9.1 for B.T. Road 108 Add on above item no. 1.9.1 for CC Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 109 Add on above item no.1.9.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 110 Work of Inter Connection in CI/DI/MS pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof andthen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). In all type Soil 80 mm to 100 mm 111 125 mm to 150 mm 112 200 mm to 300 mm 113 350 mm to 450 mm 114 500 mm to 600 mm 115 Add on above item no.1.10.1 for B.T. Road 116 Add on above item no.1.10.1 for CC Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 117 Add on above item no.1.10.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 118 Labour charges for removal of complaint of polluted water supply to the consumers 119 Survey of the locality of polluted water supply for preliminary assessment of source of pollution during supply hours 120 Labour charges for digging of pit of suitable size for removal of water pollutiononexisting distribution AC/PVC/uPVC/HDPE pipe linesup to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line byfixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof andthen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe sizeIn all type Soil 50 to 75 mm 121 80-110 mm 122 125 to 165 mm 123 200 to 300 mm 124 350 to 400 mm 125 Add on above item no.1.12.1 for B.T. Road 126 Add on above item no.1.12.1 for CC Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 127 Add on above item no. 1.12.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 128 Labour charges for digging of pit of suitable size for removal of water pollution onexisting distribution CI/DI/MS pipe linesup to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault pipe line byfixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof andthen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe sizeIn all type Soil 80-100 mm 129 125 to 150 mm 130 200 to 300 mm 131 350 to 450 mm 132 Add on above item 1.13.1 for B.T. Road 133 Add on above item no. 1.13.1 for CC Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 134 Add on above item no.1.13.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 135 Restoration of bitumen road by patch work of WBM using crushed / broken aggregate as per the standard specification and consolidation with hand rammer spreading and consolidation of binding material , cleaning of surface of WBM and providing of seal &tack coat as per site condition by using ready cold mixup to the satisfaction of engineer in charge.The rate includes the makingof pit in regular shape, all labour, material and T&P charge complete job. 136 Restoration of cement concreteroad including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compactingcement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction ofengineer incharge.The rate includes the makingof pit in regular shape, all labour, material and T&P charge complete job.
|