Special Repair Of Pipri Link Road - Providing laying spreading and compacting stone aggregates of specific size 22.4-53 mm to water bound macadam specificationincluding spreading in uniform thickness, hand packing rolling with smooth wheel roller 80-100 Km in stages to proper grade and camber , MORD G-3 2 Providing and applying tack coat with bitumen VG-10 using bitumen distributor @ 0.30 kg / sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per MORD technical specification clause 503 3 20 mm thick Open-Graded Premix Carpet using Bituminous (penetration gradie / modified bitumen) Binder Providing and laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade 4 Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grede and cross fall using Type C as per Technical Specification MORD sepecification no. Clause 510. as per Data Book item No. 5.12 (B) Case - IIIType 5 Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 6 Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing 7 The routine maintenance of above road work including patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st Year maintenance cost (0%) 8 The routine maintenance of above road work including patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd Year maintinence cost (1.50% Construction Cost) 9 The routine maintenance of above road work including patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd Year maintinence cost (3.00% Construction Cost) 10 The routine maintenance of above road work including patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th Year maintinence cost (4.50% Construction Cost) 11 The routine maintenance of above road work including patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th Year maintinence cost (6.00% Construction Cost) 12 The routine maintenance of above road work including patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for CC Pavement 1st Year maintenance cost (0%) 13 The routine maintenance of above road work including patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for CC Pavement 2nd Year maintinence cost (0.25% Construction Cost) 14 The routine maintenance of above road work including patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for CC Pavement 3rd Year maintinence cost (0.50% Construction Cost) 15 The routine maintenance of above road work including patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for CC Pavement 4th Year maintinence cost (0.75% Construction Cost) 16 The routine maintenance of above road work including patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for CC Pavement 5th Year maintinence cost (1.00% Construction Cost)
|