New Construction Work Of Damar To Kushaulipurwa Road Under Ridf - Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 meter transporting to sites spreading grading to require slope and compaction to meet requirement of table 300.1 & 300.2 with a lead up to 1000 meter as per MORD technical specification clause 301.5 MORD sepecification 301.5(i) S.No. 3.4(Ordinary soil) 2 Laying and spreading available soil in the subgrade on a prepared surface, pulverising, mixing the spread asoil in place with rotavator with 2% slaked lime having minimum 70 per cent of contents of CaO, grading with motor grader and compacting with the smooth wheel road roller at OMC toer centthe desired density to form a layer of improved Sub-grade as per Technical Specification Cluase 403. (A) By Manual Means 3 Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. 4 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (A) By Manual Means 5 Providing, Laying and spreading material on a prepared sub grade, adding OP cement @ 2% by weight of the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined compressive strength and to form a layer of sub base. CTSB 6 Providing, Laying and spreading material on a prepared sub grade, adding OP cement @ 4% by weight of the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined compressive strength and to form a layer of sub base. CTB 7 Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical pecification Clause 503. 8 Providinglaying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 grade bitumen to required line ,grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant,laying and rolling with a three wheel 80-100 KN static roller capacity finished to required level and grades to be followed by seal coat . Technical sepecification Claues 508 9 Providing and laying seal coat by manual means with VG-10 grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type-C As per Technical Specification Clause 510 10 Construction ofun-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design,laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, 11 PatriLaying and spreading available soil in the subgrade on a prepared surface, pulverising, mixing the spread asoil in place with rotavator with 2 pslaked lime having minimum 70 per cent of contents of CaO, grading with motor grader and compacting with the smooth wheel road roller at OMC toer centthe desired density to form a layer of improved Sub-grade as per Technical Specification Cluase 403. (A) By Manual Means 12 Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial. S.I.No-253(a) 13 Fine Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 Km. (5 miles) from the side of work & including watering,dressing etc. Rate to include cost of all materials,labour and tools & plants,etc. required for proper completion of the work. S.I.No-255 14 Bedding for Pipe Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii) 15 Cement concrete with 4cm gauge approved stone ballast, approved coarse sand. cement in the proportion 8:4:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. 16 Class-150 brick work in 1:4 cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. Required for proper completion of the work. S.I.No-305 17 Struck pointing with cement mortar consisting of 1 part cement and 2 parts of fine sand of 1.25 finerness modulus. S.I.No-574 18 Providing and laying of hume pipe NH-3 for culverts with filing of joints in cement and sand mortar in 1:2 includinglabour, T&P etc required for proper completion of work as per of Engineer-in-Charge.1000 mm dia 19 Supply & Laying cement concrete pipe NP-3 350 mm dia (burried Conduits) on first calss bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation protection works, backfilling. concrete and masonary work in head wall and parapoets as per MORD specification no. 1100 sr no. 9.7 as per Data book item no. 9.70 20 Cement concrete with 20mm (1/2) gauge approved stone ballast, approved coarse sand. cement in the proportion 4:2:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. As per S.I. 279(a). 21 12mm thick plaster on brick work minimum thickness not less than 10mm with 1part of cement and 4 part of find sand of 1.25 fineness modulus. As per SI. No.-584 22 Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri ,culvert,road furniture etc.as direction of E.I for the period of five years from the actual completion of workMaintenance cost for 1st year (@ 0 % of total work amount ) 23 Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri ,culvert,road furniture etc.as direction of E.I for the period of five years from the actual completion of workMaintenance cost for 2nd year (@ 0.75 % ofPC Portion work amount) 24 Maintenance Charge including @ Earth work , repair of painted surface, earthwork on patri ,culvert,road furniture etc.as direction of E.I for the period of five years from the actual completion of workMaintenance cost for 3rd year (@ 1.5% ofPC Portion work amount) 25 Maintenance Charge including @ Earth work ,repair of painted surface,earthwork on patri ,culvert,road furniture etc.as direction of E.I for the period of five years from the actual completion of workMaintenance cost for 4th year(@ 2.25 % ofPC Portion work amount) 26 Maintenance Charge including @ Earth work ,repair of painted surface,earthwork on patri ,culvert,road furniture etc.as direction of E.I for the period of five years from the actual completion of workMaintenance cost for 5th year (@ 3.0% of PC Portion work amount) 27 Maintenance Charge including @ Earth work ,repair of CC surface, earthwork on patri , etc.as direction of E.I for the period of five years from the actual completion of workMaintenance cost for 1styear (@ 0.0 % of CC Portion work amount ) 28 Maintenance Charge including @ Earth work ,repair of CC surface, earthwork on patri , etc.as direction of E.I for the period of five years from the actual completion of workMaintenance cost for Zero to 2nd year (@ 0.25 % of CC Portion work amount ) 29 Maintenance Charge including @ Earth work ,repair of CC surface, earthwork on patri , etc.as direction of E.I for the period of five years from the actual completion of workMaintenance cost for Zero to 3rd year (@ 0.5 % of CC Portion work amount ) 30 Maintenance Charge including @ Earth work ,repair of CC surface, earthwork on patri , etc.as direction of E.I for the period of five years from the actual completion of workMaintenance cost for 4th year (@ 0.75 % of CC Portion work amount ) 31 Maintenance Charge including @ Earth work ,repair of CC surface, earthwork on patri , etc.as direction of E.I for the period of five years from the actual completion of workMaintenance cost for 5th year (@ 1.0 % of CC Portion work amount )
|