Landscape Architectural Services – Partial Landscaping Of Karolinas Outpost In 2025. Technical Operational Plan For Mine Closure And Landscaping Of The Karolina Coal Mine On The Pécs-Mecsekszabolcs-Kőszén Mine Plot Ii. As Part Of The Implementation Of The Plan, The Collection, Loading And Transport Of A Total Of At Least 340,000 M3 Of Waste Material From The Waste Dump Of The Mining Operation To The Open-Pit Mining Pit Over A Transport Distance Of 4,000-5,000 M (There And Back Together) With All-Wheel Drive Rigid Box Trucks. Part Of The Task Is The Rescue And Transfer Of Approximately 25,000 M3 Of Soil - Located Above The Barren Area To Be Mined - In The Area Of The N Barren Pit For A Distance Of 0-1,000 M, 5,000 M3 For A Distance Of 0-3,000 M (Round Trip Combined), As Well As Logging And Clearing Of Stumps In An Area Of 3.5 Ha. Tasks To Be Carried Out In Particular: • Saving, Picking Up And Moving The Soil Located Above The Barren Material Within A Maximum Of 500 M, Then Spreading It On The Surface That Has Already Been Developed In Accordance With The Mine Closure And Landscaping Plan In A Thickness Of 40 Cm Or Depositing It In The Designated Place For Later Spreading. • Excavation Of Tailings In Accordance With The Mine Closure-Landscape Plan, Transporting The Extracted Tailings To The Mine Pit With A Maximum Transport Distance Of 2,500 M And Piling Them There, Then Creating A New Filling Level With Dozer Work. • In The Area Marked On The Sketch Map In Annex No. 6 Of The Technical Description, Carrying Out Timber Harvesting And Log Removal, Transporting Timber And Logs Within 1500 M To The Designated Place And Selectively Depositing Them There. • The Construction And Continuous Maintenance Of Transport Routes, Protective Embankments Along Transport Routes As Necessary, Dust Removal Of Transport Routes By Sprinkling. • Ancillary Tasks Are The Marching Up And Down, The Establishment Of The On-Site Site And Its Guarding, The Establishment Of On-Site Electricity Procurement, The Payment Of The Price Of The Purchased Electricity. • After Signing The Contract, The Winning Bidder Must Carry Out Occupational Health And Safety Commissioning For The Machines Delivered To The Site In The Area Of The Mine Operation, And Hand Over The Relevant Document To The Mine Contractor. The Amount Of The Contract Is Huf 623,224,409 Net, Planned For A Minimum Of 340,000 M3. The Detailed Technical Description Is Contained In The Public Procurement Documents.
Contact Information
Contact No.
+36 12010611
Email
lovasz.gyorgy@bvh.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 90293108
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.