1. The Subject Of The Order Is The Modernization Of A Farm Building Into Sports And Sanitary Facilities In The School Complex No. 10 At Ul. Perzyńskiego 10 In Warsaw In Accordance With The Design Documentation Developed Under The Name Reconstruction And Change Of Use Of A Residential Building Into A Public Utility Building - Educational Facility, Consisting Of A Land Development Design, An Architectural And Construction Design, Based On Which Decision No. 40/Bie/Pb /2024 A Building Permit Was Obtained And Technical Designs For The Following Industries: Architectural And Construction, Sanitary Installations, Electrical Installations, Telecommunications Installations And Technical Specifications Execution And Acceptance Of Construction Works, Constituting Subsequent Annexes 9-15 To The Swz. The Ordering Party Attaches The Bills Of Quantities Together With The Design Documentation, Provided That These Are Auxiliary Documents That Can Be Used To Evaluate The Offer, While The Leading Documents Are The Documents Constituting The Design Documentation (Appendices 9-15 To The Swz).2. Location And Address Of The Investmenta) Plot No. 113, District 7-05-13B) Address: Ul. W. Perzyńskiego 10A, 01-883 Warszawa3. Characteristic Parameters Defining The Scope Of Construction Works - Usable Area 68.67 M2, - Net Area 120.99 M2, - Height Of The Building 3.8 M, - Length Of The Front Facade 13.83 M, - Width Of The Building 15.90 M, - Number Of Storeys Aboveground 14. The Subject Of The Order Includes: A) Execution Of Works Assembly And Construction Works Based On Design Documentation In The Scope Of: Preparation Of The Site For Construction, Demolition Works, Masonry Works, Roofing Works, Insulation Works, Façade Works, Finishing Works, Replacement Of Window And Door Joinery, Sanitary Installations (Ventilation And Cooling Installation, Central Heating Installation, Water Installation And Sewerage), Electrical Installations (Installation Of Basic, Emergency And Evacuation Lighting, Installation Of Power And Plug Sockets, Lightning Protection Installation, Anti-Shock And Anti-Overvoltage Protection), Telecommunication Installations (Structural Installation, Closed-Circuit Television Installation, Burglary-Attack Alarm Installation, Call Installation, Video Intercom Installation, Av Installation);B) Development Of A Work Organization Project;C) Development Of A Safety And Security Plan Health; D) Preparation Of As-Built Documentation Along With Instructions For Use And Maintenance Of The Installed Devices.5. Additional Information Regarding The Work: The Ordering Party Informs That The Work Will Be Carried Out In The Vicinity Of An Active School Building. Nuisance Construction Works Should Be Planned For Afternoon Hours Or Days Off From School And Work. When Organizing The Works, The Employer Requires That Special Attention Be Paid To The Safety Of Children And School Staff By Separating And Marking The Construction Area6. Accessibility For Disabled People: The Subjec
|