Quotation are invited for Supply, Excavation, and Installation of Water Meter M-BUS AMI-Cabling PVC Conduit Civil works Dubai UAE 1032405783 .1 ITEM-00001 MOBILIZATION & SITE SURVEY:AS PART OF THE MOBILIZATION AND SITE SURVEY SHALL BE DONE BY THECONTRACTOR TO OBTAIN THE BUILDING MANAGEM ENT PERMISSION, NOCS FROM DEWAWATER/ELECTRICITY, DM, ETISALAT AND RTA AS PER THE REQUIREMENTS OF THEPROJECT & DEWA SPECIFICATIONS. 200 EA 2 ITEM-00001 PVC CABLE CONDUITS WORKS FOR INTERLOCK SURFACE:REMOVE ALL TYPES OF EXISTING INTERLOCK, SURFACES, OR PAVEMENT, ANDPERFORM EXCAVATION AS REQUIRED. THE WIDTH AND DEPTH OF THE TRENCH SHALLBE 400 MM. AFTER EXCAVATION, TWO (02 NO.) 25 MM PCV CONDUITS WITH 4 MMNYLON ROPE SHALL BE INSTALLED ACCORDING TO THE PROJECT SPECIFICATIONS.SAFETY MARKINGS, SAFETY TAPE, CAUTION SIGNS, BACKFILLING, COMPACTION,AND INTERLOCK PAVEMENT REINSTALLATION SHALL BE PERFORMED IN ACCORDANCEWITH THE BUILDING OWNER#S APPROVAL DEWA 1.800 RM SPECIFICATIONS AND INSTRU CTIONSPROVIDED BY THE DEWA ENGINEER. 3 ITEM-00001 PVC CABLE CONDUITS WORKS FOR LANDSCAPE/ROAD BASE/SOIL SURFACE:MANUAL EXCAVATION WORK SHALL BE PERFORMED BY THE CONTRACTOR FROM DEWAB ULK WATER METER TO THE BUILDING LV ROOM. THE WORK SHALL BE CARRIED OUTAT THE EXISTING GROUND LEVEL, WHICH CONSISTS OF LANDSCAPE AREA , ROADBASE AND SOIL SURFACE OR GREEN AREAS. THE WIDTH AND DEPTH OF THE TRENCHSHALL BE 400 MM. AFTER THE EXCAVATION, TWO (02 NO.) 25 MM PVC CABLECONDUITS WITH 4 MM NYLON ROPE SHALL BE INSTALLED ACCORDING TO THEPROJECT SPECIFICATIONS. SAFETY MARKINGS, SAFETY TAPE, C AUTION SIGNS,BACKFILLING, COMPACTION, AND LANDSCAPE GREEN AREAS ROAD BASEREINSTALLATION SHALL BE PERFORMED IN ACCORDANCE WITH THE BU ILDINGOWNER#S APPROVAL, DEWA 100 RM SPECIFICATIONS AND INSTRUCTIONS PROVIDED BY THEDEWA ENGINEER SPECIAL NOTES / INSTRUCTIONS: Supply, Excavation, and Installation of Water Meter M-BUS AMI-Cabling PVC Conduit Civil works Dubai UAE for more information contact Muhammad Asif Akhtar - Phone : +971508725087 - Retention Condition : 5% Site visit date : 23.01.2024 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332403246)/$value
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 90282903
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.