Building Construction Work – New Building Inclusive School Center Am Ellernholzteich In Greifswald. - Seals / Insulation - Concrete Installation, Device Connection Boxes - Prefabricated Reinforced Concrete Parts, Semi-Finished Reinforced Concrete Parts, Wall, Support, Beam - Hollow Prestressed Concrete Floorboards - Concrete Cosmetics - Masonry / Plastering Work - Interior Masonry - Carpentry Work / Timber Construction - House A O Approx. 1,320 M3 Excavated Foundation Grid O Approx. 661 M2 Planing The Excavation Pit And Foundation Floors O Approx. 500 M3 In-Situ Concrete Of The Beams On Pile Heads, C30/37 O Approx. 410 M3 In-Situ Concrete Of The Floor Slabs, C30/37, D=0.25 M O Approx. 380 M2 Of Formwork Ceiling Slab, D=35 Cm, O Approx. 270 M2 Of Semi-Finished Wall, Aw, D = 30 Cm, H = 3.30-4.00 M Or Approx. 420 M2 Semi-Finished Wall, Aw, D = 30 Cm, H = 5.35 M O Approx. 150 Running Meters Of Double Wall Elements O Approx. 640 M2 Wall Panel Ft, D = 14 Cm, H = 3.50 M O Approx. 145 Running Meters Of Ceiling Support Prefabricated Part Standard Version, C30/37 , W/H Approx. 45Cm/105Cm O Approx. 150 M2 Prestressed Concrete Hollow Slab Ceiling, D = 25 Cm, O Approx. 390 M2 Prestressed Concrete Hollow Slab Ceiling, D = 32 Cm, O Approx. 115.5 T Of Reinforcing Bars Din 488 For Prefabricated And Semi-Finished Parts, D 6-12Mm, Wall O Approx. 60 M3 Deliver Of Glued Laminated Timber, Secondary Beams, Gl 24H O Approx. 83 T Hall Main Beam House A Consisting Of 4 Hollow Boxes, Cross-Sectional Beams O Approx. 1,185 M2 Acoustic Trapezoidal Sheet Metal Support Shell, Ak 100/275/1.25Mm, Ral 1035 - House B O Approx. 1,600 M3 Excavation Of Foundation Grid O Approx M3 Of In-Situ Concrete Of The Beams On Pile Heads, C30/37 O Approx. 500 M3 Of In-Situ Concrete For The Floor Slabs, C30/37, D=0.25 M O Approx. 640 M2 Of Semi-Finished Wall, Aw, D= 30 Cm, H= 3.30-4.00 M O Approx. 165 M2 Of Semi-Finished Wall , Aw, D= 30 Cm, H= 5.35 M O Approx. 2,475 M2 Prestressed Concrete Hollow Slab Ceiling, D = 26.5 Cm O Reinforcing Steel O Approx. 13 Hall Main Beams House C Double-T Beam Hea340 - House C O Approx. 1,610 M3 Excavated Foundation Grid O Approx M3 Of In-Situ Concrete Of The Beams On Pile Heads, C30/37 O Approx. 500 M3 In-Situ Concrete Of The Floor Slabs, C30/37, D=0.25 M O Approx. 724 M2 Semi-Finished Wall, Aw, D= 30 Cm, H= 3.30-4.00 M O Approx. 140 M2 Semi-Finished Wall, Aw, D= 30 Cm, H= 5.35 M O Approx. 2,420 M2 Prestressed Concrete Hollow Slab Ceiling, D=26.5 Cm O Reinforcing Steel O Approx. 13 Main Hall Girders House C Double T-Beam Hea340
|