Architectural, Construction, Engineering And Inspection Services – Stade Vander Putten Stadion_Multidisciplinary Team. The Purpose Of The Assignment Is To Act As Project Designer For The Development Of The Vander Putten Stadium Site (Located At Slachthuislaan, 51, 1000 Brussels), With A View To The Construction Of New Sports Infrastructure, The Restructuring And Optimization Of The Existing Spaces , The Construction Of 120 Social And Medium-Sized Homes And The Development Of The Environment. The Project Designers Assignment Includes All Services Related To The Perfect Execution Of The Works, In Particular The Complete Studies: - Architecture - Landscape Architecture ; - Engineering Stability - A Complete Engineering Assignment Of Special Construction Techniques (Hvac, Sanitary Facilities, Electricity, Vertical Transport, Acoustics); - - Epb Advisor: - Acoustics - Surveyor ; - Environmental Expertise And Sustainability; The Assignment Regarding Coordination Of Health And Safety Is Not Included In This Assignment And Is Ensured By The Land Management Contractor. The Tenderer Provides The Latter With The Elements Required For His Assignment In Connection With The Project. The Fees Have Been Determined By The Contracting Authority By Applying A Lump Sum Amount Of €6,890,000.00 Excl. Vat For The Multidisciplinary Design Team. Estimate Of Work The Tenderers Attention Is Drawn To The Wish Of The Contracting Authority To Carry Out A Project That Strikes The Right Balance Between Creative, Efficient And Sustainable Architecture And Cost Savings To Which The Tenderer Must Pay Attention, Both From The Point Of View Of The Renovation And The Later Management Of The Building. The Estimated Cost Of The Construction Work Is €62,633,150.00 Excluding Vat (Excluding Vat, Contingencies, Asbestos Removal And Removal Of Contaminated Soil; Including Demolition And Adjustment Of The Arts & Crafts Elements). This Is A Sealed Envelope That The Bidder Must Respect. The Budget Will Be Controlled On The Basis Of Allocations, Which Are Temporarily Broken Down As Follows (Taking Into Account The Programmed Areas): - Sports And Youth Facilities 38% - I.E. €25,210,000.00 (Excluding Vat - Excluding Environment And Demolition) - Equipment For Park Rangers: 1% - I.E. € 812,500.00 (Excl. Vat) - Residential Land Management: 19% - I.E. €12,480,000.00 (Excl. Vat) - Homes Bghm: 28% - I.E. €18,720,000.00 (Excl. Vat) - Sports Parking: 8% - I.E. €2,076,000.00 (Excl. Vat) - Parking + Basements Of Homes Land Management: 7% - I.E. €1,903,000.00 (Excl. Vat) - Open Spaces - € 1,003,650.00 (Excl. Vat) - Demolition And Renovation Iam - €428,000 (Excl. Vat) All Information Regarding This Command Can Be Found In The Specification Rf/23/Pcan/947Ter, Which Can Be Downloaded At Https://Cloud.3P.Eu/Downloads/1/381/T3/2024
|