Track Construction Works – Vp03 Tender For Construction Work For Slab Track Route 6185. The Slab Track Of The Double-Track Electrified Sfs 6185 Is To Be Renovated Over A Total Of Around 53 Kilometers. There Are 3 Sections. The Overall Award Is Made In 2 Lots As A Lot: // Lot 1: Slab Track West Nahrstedt - Gardelegen (26.3 Km) From Km 215.5 - Km 241.4 - Traffic Facilities: Dismantling: 2X Approx. 25.9Km Ff; Transition Areas Ff-Scho; 9 Switches (Ff) // Disposal: Superstructure (Ff & Scho); Civil Engineering And Cable Engineering // New Building: 2X Approx. 25.9Km Ff; Transition Areas Ff-Scho; 6 Switches (Ff); Tamping Work On Switches And Tracks // Cable And Civil Engineering Work - Electrical Systems: Dismantling Of 2 Pieces Of Ewha // New Construction Of 3 Pieces Of Ewha - Telecommunications: Dismantling Of Existing Systems (Fiber Optic Or Cu Cable System) Approx. 3 Km // Construction Of Fiber Optic Cables And Cu Cable Systems (Final State) Approx. 3 Km - Lst: Dismantling, New Construction Or Temporary Systems From/In Estws Or Neighboring Operating Locations - Ola: Minor Related Measures - Lbp Measures - Planning Services // Lot 2 (Section A): Slab Track East Wuster Damm - Schönhausen West (10.9 Km) From Km 183.3 - Km 193.8: - Traffic Facilities Dismantling: 2X Approx . 10.5Km Ff; Transition Areas Ff-Scho; 4 Switches (Ff) // Disposal: Superstructure (Ff & Scho); Civil Engineering And Cable Engineering // New Building: 2X Approx. 10.5Km Ff; Transition Areas Ff-Scho; 3 Switches (Ff); Tamping Work On Switches And Tracks // Cable Engineering And Civil Engineering Work - Electrical Systems: New Construction Of 1 Piece Of Ewha - Telecommunications: Dismantling Existing Systems (Fiber Optic Or Cu Cable System) Approx. 8 Km // Construction & Dismantling Of Fiber Optic And Cu Cable Systems ( Construction Status) Approx. 3.2 Km // Construction Of Fiber Optic And Cu Cable Systems (Final State) Approx. 8.6 Km - Lst: Dismantling, New Construction Or Temporary Systems From/In Estws Or Neighboring Operating Locations - Ola: Minor Related Measures - Lbp Measures - Planning Services // Lot 2 (Section B): Slab Track East - Additional 16Km Bamme Junction To Wuster Damm From Km 166.1 - Km 183.3 - Dismantling Of Traffic Facilities: 2X Approx. 16Km Ff; 6 Switches (Ff) // New Construction: 2X Approx. 16Km Ff; 6 Switches (Ff) // Adaptation Of The Railway Body And Drainage Systems - Electrical Systems: Adaptation Measures, If Necessary - Telecommunications: Adaptation Measures, If Necessary - Lst: Adaptation Measures, If Necessary - Ola: Adaptation Measures, If Necessary - Planning Services The Existing Superstructure Is Within The Scope Of This Measure To Be Renewed In All 3 Sections.
Contact Information
Address
Adam-Riese-Straße 11-13
Contact No.
+49 34123425972
Email
markus.repert@deutschebahn.com
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 90181835
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.