Building Construction Work – Campus Iba-Terrassen - 2Nd Ba/Part 2 - New Building Energy Workshop - Lot 02: Extended Building. Construction Site Equipment: - Measurement Work - 924 M2 Of Terrain Preparation For The Construction Site Equipment - 2 Tower Cranes 160Tm - 405 M Construction Site Fence With Privacy Net - Security Lighting And Camera Surveillance For Accident Prevention - Construction Site Power Supply - 2 Sanitary Containers With Faecal Tank - Construction Water Supply - Meeting Container 30 M2 - Waste Collection Point With 3 Skip Containers 10 M3 Basic Pipes: - 190 M3 Pipe Trench - 10 M3 Gravel - Sealing Inserts Media Pipes - 160 M Pressure Pipe Pe100 Air Conditioning Cold Water - 40 M Cable Protection Pipe Dn 75 Pe - 160 M Pipes In The Pipe Trench - 40 M3 Gravel Sand 0/8 - 190 M Pp-Md Pipe - 19 Floor Penetrations Plastic Pressurized Water-Tight - 4 Floor Drains - Individual House Entry Drinking Water Dn40 - 10 M Pe-Hd Pipe Drinking Water 50 X 4.6 - 9 Fiber Cement Casing Pipe - 10 Savings Building Entry For Electricity, Water Or Gas - 185 M Camera Inspection Earthworks: - 900 M3 Excavation Of Construction Pits - 140 M3 Excavation Of Shaft Pits Up To 3 M - 92.5 M2 Shaft Pit Shoring - 1,135 M2 Excavation Pit Level - 177 M3 Foundation Excavation - 100 M3 Excavated Earth Removal And Disposal - 1,098 M2 Geotextile Fleece - 168 M3 Recycled Gravel - 200 M3 Filling Floor Seals: - 841 M2 Separating Layer Pe Film - 58 M2 Sealing Shafts W2-B With Fpd - 69 M2 Sealing Under Walls - 641 M2 Of Insulation Under Xps Floor Slab 035 Ds, 160 Mm - 99 M2 Perimeter Insulation Pw , D 55 - 35 M2 In-Situ Concrete Shaft Walls, Wu Bk 1, D 40 - 735 M2 In-Situ Concrete Floor Slab Wu Bk 2, D 30 - 131 M2 In-Situ Concrete Floor Slab Wu Bk 1, D 30 - 19.5 M3 In-Situ Concrete Foundation Unreinforced - 167 M3 In-Situ Concrete Foundation Reinforced Concrete - 542 M2 Of Formwork - 44 T Of Reinforcing Steel - 32 Pipe Penetrations Reinforced Concrete Work: - 1,026 M2 Of In-Situ Concrete Outer Wall - 296 M2 Of In-Situ Concrete Inner Wall - 1,140 M2 Of Formwork - 426 M2 Of Trapezoidal Girder Round Formwork, Inner Wall - 22 M Of In-Situ Concrete Lintel - 165 M2 Of Openings/Recesses - 15 Core Drillings - 40 T Of Reinforcing Steel - 700 M2 Prestressed Concrete Ceiling Panels - 373 M2 In-Situ Concrete Ceilings - 36 M In-Situ Concrete Coating - 2 Reinforced Concrete Stairs Masonry Work: - 84 M2 Sand-Lime Brick Ks 12-1.4, Nm Ii A - 23 M Ks Flat Lintel Lightning Protection/Earthing System: - 440 M Foundation Earth Rod - 415 M Mesh Earth Electrode - 42 Connecting Lugs - 40 M Insulated Down Conductor - 12 Air-Termination Rods - 270 M Air-Termination Cable - 2160 M Empty Piping Ceilings Plastic Armored Pipe - 2160 M Empty Piping In-Situ Concrete Walls Plastic Armored Pipe
Contact Information
Address
Seestraße 16
Contact No.
+49 35753-27614
Email
vergabe@grossraeschen.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 90177597
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.