Construction Work For Bridges And Tunnels, Shafts And Subways – S6 Western Road Bypass Of Szczecin - Section 3 Police – Goleniów (From Km 27+403 To Km 50+810.20). The Scope Of The Order Includes The Preparation Of The Necessary Design Studies (Including Technical Design And Detailed Design) Based On The Construction Design (Pb) Approved By The Decision To Authorize The Implementation Of A Road Investment And The Construction Of An Expressway With A Length Of Approx. 23.407 Km On The Section From Km 27 +403 To Km 50+810.20 Along With A Two-Bay Tunnel Under The Oder. The Task Should Include, Among Others: Road Junctions: Police And Modrzewie And The Expansion Of The Wa Goleniów Północ Junction, Mop Bolesławice, The Road Maintenance District (Oud) With The Administrative And Social Building And Accompanying Buildings And The Tunnel Management Center Building, Reconstruction Of Existing Roads In The Scope Of Collision With The Expressway, Construction And/Or Reconstruction Of Infrastructure For Pedestrians And Cyclists, Engineering Structures Along The Expressway And Along Roads Intersecting With Expressway, Area Drainage System, Environmental Protection Devices, Power Supply And Lighting Networks, Water Supply Networks, Sewage Treatment Networks And Devices, Storm Sewage System With Pre-Treatment Devices, Additional Photovoltaic Power Supply, Additional Power Supply With Generators And Others, Reconstruction Of Conflicting Devices And Networks Of Existing Infrastructure Underground And Above Ground, Telecommunications Network For The Needs Of The Ordering Party, Along With Fiber Optic Infrastructure, Road Lighting, Traffic Management System (Szr), Along With Sections Of The S3 Expressways From The Goleniów North Junction To The Radziszewo Junction And The A6 From The Radziszewo Junction To The Szczecin Zachód Junction, The Safety And Traffic Management System In The Tunnel, Strengthening The Ground And Ensuring The Stability Of Excavation And Embankment Slopes. The Total Estimated Order Of Magnitude Of The Order Value Exceeds Eur 20,000,000. The Ordering Party Reserves The Obligation For The Contractor To Personally Perform Key Tasks, I.E. A) The Surface Of The Main Route, Including The Production And Installation, And The Execution Of The Remaining Layers Of The Surface Structure Above The Native Soil (Excavation) Or Fill Soil (Embankment), Excluding The Supply Of Materials And Services. (B) Tunnel Construction, Excluding The Supply Of Materials And Services. With Respect To Key Tasks Reserved For Personal Performance By The Contractor, The Contractor Cannot Rely On The Capabilities Of The Entity Providing Resources, Under The Principles Set Out In Art. 118 Section 1 Of The Public Procurement Law, In Order To Demonstrate Compliance With The Relevant Conditions For Participation In The Proceedings.
|