Approval Plans, Working Drawings And Specifications – Design Of A Handball Hall.. Carrying Out The Planning Tasks Of A Handball Hall With A Mobile Stand System For 300 People On The Property Located At 5904 Orosháza, Gyopárosi Út 3. A., Orosháza 7505/9 Hrsz., In Nature 5904 Orosháza, Gyopárosi Út 3.A. Tasks To Be Performed: 1. Preparation Of Preliminary Plans 2. Preparation Of Licensing Plans 3. Preparation Of Construction Plans And Cost Estimates 4. Design Supervision The Client Intends To Implement The Investment Within 3 Tao Years, Of Which The Planning Processes Will Start In The Current Tao Year. The Bidder Intends To Implement The Energy Background Of The Investment By Using Renewable Energy Sources In The Majority. During The Performance Of The Task, The Bidder Must Prepare With Great Precision The Technical Conditions For The Use Of These Energy Sources From A Planning Point Of View. No Specific Preliminary Studies Are Available Regarding The Features Of The Construction Site In This Respect. In Order To Clarify The Environmental Effects Of The Construction Activity, The Environmental Impact Assessment Must Also Be Prepared During The Preparation Of The Task, Which Must Be Priced As Part Of The Licensed Plan. During The Construction Of The Building, It Must Be Checked Whether The Characteristics Of The Current Plot Of Land Make It Suitable For The Placement Of This Type Of Structure In Terms Of Noise And Vibration, For This Purpose Noise And Vibration Protection Documentation Must Be Prepared. It Is The Task Of The Successful Bidder To Carry Out A Detailed Examination Of The Utility Supply Of The Plot. During The Authorization Process, The Winning Tenderer Must Contact The Utility Providers And Obtain Their Declaration Regarding The Utility Supply. The Basic Contract Also Includes The Planning Of Utility Replacements Necessary For The Location Of The Building, If They Are Within 2 M Of The Building, Otherwise Not. It Is Also Necessary To Plan The Connection Of The Building To The Structured Network, So Also The Telecommunications Access. In This Regard, The Necessary Negotiations With The Service Provider Must Also Be Carried Out. The Successful Tenderer Will Start His Work By Preparing The Geodetic Survey In The Area, In Connection With Which A Preliminary Investigation Is Required In Terms Of Whether The Land Is Suitable For The Location Of The Building From The Point Of View Of The Land Registry And Land Register. If Land Development Is Also Necessary For This, Then It Is The Responsibility Of The Offeror To Carry Out The Land Development Based On The Outline Of The Land Office Processes And Related Processes, Or On The Basis Of Authorization. When Fitting Into The Environment And Landscape, One Must Strive To Fit Into The Appropriate Local And National Cityscape. In Order To Do This, The Winning Tenderer Must Prepare The Plans In The Appropriate Detail. The Preliminary Consultation With The Chief Architect Of Orosháza City Must Be Part Of The Planning. The Task Of Adopting The Townscape And Regulatory Aspirations Declared By It Can Be Separated
Contact Information
Contact No.
+36 708857071
Email
info@csikosport.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 90167223
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.