Construction Work – Design And Execution Of Works For The Task Titled: Revitalization Of Railway Line No. 108 On The Jasło - Nowy Zagórz Section As Part Of The Project Entitled Revitalization Of Railway Line No. 108 On The Jasło - Nowy Zagórz Section Along With The Construction Of The Jedlicze - Szebnie Railway Connection. The Subject Of The Order Is The Design And Execution Of Works For The Task Titled: Revitalization Of Railway Line No. 108 On The Jasło - Nowy Zagórz Section As Part Of The Project Entitled Revitalization Of Railway Line No. 108 On The Jasło - Nowy Zagórz Section Along With The Construction Of The Jedlicze - Szebnie Railway Connector The Basic Scope Includes: Design And Development Of The Concept Of Electrification Of Railway Line No. 108 On The Krosno - Nowy Zagórz Section From Km 69,000 To Km 116,200 And Execution Of Works Construction For Railway Line No. 108 On The Jasło - Krosno Section, From Km 47,000 To Km 69,242, In Terms Of The Track System With Turnouts And Drainage, Railway Subgrade, Geology, Geotechnics, Engineering Structures, Rail And Road Crossings And Crossings, Roadways, Passenger Service Facilities And Small Architecture, Facilities And Buildings Used For Traffic Management Railway, Railway Traffic Control Devices, Power Engineering Up To 1 Kv, Telecommunications And Telecommunications, Sanitary Industry, Environmental Protection, Disposal Collisions With External And Internal Networks, Demolition And Liquidation Of Infrastructure, Felling Of Trees And Bushes. The Description Of Options No. 1-4 Can Be Found In Section 5.1.1 Purpose, In The Field: Option Description. The Entire Subject Of The Order Includes The Preparation Of The Following Elements: 1) Design Documentation, Including: A) Updating Of Construction Designs In The Following Sectors: Railway Traffic Control, Telecommunications, Power Engineering And Cubature Facilities, B) Development Of An Executive Design, C) Preparation Of As-Built Documentation, Including As-Built Geodetic Documentation, 2) And Works In The Scope Of: A) Works In The Track, Subgrade And Platform Industry, Including Small Architecture, B) Works In The Industry Drainage, C) Works In The Construction Industry Related To Railway Traffic, Including Demolitions, D) Works In The Engineering Industry, E) Works In The Sanitary Industry (Internal Sanitary Networks [Including Water And Sewage, Gas, Air Conditioning, Ventilation, Heating] And External Networks) , F) Works In The Road Industry, G) Works In The Traction Network Industry With Power Supply And Control Of Traction Network Disconnectors, H) Works In The Non-Traction Power Industry, I) Works In The Control Industry Railway Traffic, J) Works In The Telecommunications Industry, K) Works In The Non-Traction Lines Industry, L) Works Related To The Removal Of Conflicting Networks, M) Works In The Environmental Protection Industry, Including Works Related To The Felling Of Trees And Shrubs, N) Any Other Necessary For The Implementation Tasks In Accordance With Applicable Regulations, 3) Carrying Out The Process Of Assessing The Conformity Of Structural Subsystems Within The Scope Of The Order At Each Stage (Design, Construction And Final Tests Of The Subsystem) And Submitting The Appropriate Ec Verification Declarations And Ec Verification Certificates For Subsystems. A Detailed Description Of The Subject Of The Order Is Presented In The Functional And Utility Program (Ffu) Constituting Volume Iii Of The Swz. The Project Is Applying For Co-Financing By The European Union From The European Funds For Eastern Poland Instrument. Additional Information Section
|