1. The Subject Of The Order Is The Performance Of Construction Works As Part Of The Implementation Of The Investment Task Titled: Renovation And Reconstruction Of Public Buildings In The Narol Commune. Scope Of Construction Works With A Description Of Construction Works: Task No. 1. Renovation Of The Roof And Replacement Of Windows At The Primary School. Saint Brother Albert In Narol. The Task Includes The Renovation Of The Roof Consisting Of Changing The Roof Covering From Roofing Felt To Trapezoidal Sheet Metal And Replacing The Windows And Doors Of The External Walls In The School Building. Task No. 2. Renovation And Modernization Of The Bojkówka Shelter In Ruda Różaniecka. The Scope Of Works Includes :- Making New Concrete Balusters In The Shape Of The Existing Ones,- Making Terrace And Stairs Cladding Made Of Flamed Granite Slabs,- Making New Railings For The Stairs To The Vestibule, - Cladding Of The Stairs To The Vestibule With Flamed Granite Slabs, - Installation Of Mosaic Plaster On The Side Of The Stairs Leading To The Vestibule, - Replacement Of Wooden Elements On The Facade, - Replacement Of External Door Joinery, - Replacement Of Damaged Glass Units In Windows, - Replacement Of The Roof Covering, - Finishing Of Chimneys Above The Roof, - Replacement Of Gutters And Downpipes, - Painting Of The Facade, - Construction Of An Awning Above Terrace, - External Monitoring, - Demolition Of Part Of Partition Walls, - Widening Of Openings And Forging New Door Openings, - Removing Plaster From Existing Walls And Ceilings, - Dismantling Wooden Floors And Vinyl Flooring, - Dismantling Kitchen Cores, - Dismantling Board Walls ,- Disassembly Of Door Joinery,- Construction Of Leveling Joists On The Floor,- Laying Osb Boards On The Joists,- Execution Acoustic Insulation Of Horizontal Partitions Made Of Mineral Wool, - Installation Of Tile Cladding On The Walls, - Installation Of New Partition Walls In The Dry Plasterboard System, - Installation Of Tile Floors And Vinyl Panels, - Installation Of New Cement And Lime Plasters, - Installation Of Suspended Ceilings, - Filling And Painting Wall And Ceiling Surfaces, - Wallpapering Walls, - Making New Internal Doors, - Renovation Of Existing Stairs Wooden, - Insulating The Ceiling, - Insulating The Attic With Mineral Wool, - Insulating Some Of The Building Partitions, - Reconstructing The Wooden Stairs Leading To The Basement, - Installing New Water And Sewage Installations, - Installing Domestic Hot Water Installations. And Central Heating, - Construction Of An Air Conditioning Installation, - Construction Of A Mechanical Ventilation Installation - Heat Recovery With Heat Recovery, - Construction Of A New Electrical Installation From 230V Low-Current Power Supply, Including: Access Control Installation, Alarm Installation, External Monitoring And Lighting. Task No. 3. Renovation Including With The Reconstruction Of The Village Community Center In Leipzig. The Scope Of Works Includes: - Rebuilding Part Of Th
|