4.1. The Subject Of The Order Is A Service Called Winter Cleaning Of Sidewalks, Parking Lots, Squares And Transport Stops And Emptying Trash Bins In 2025. The Contractor Will Be Obliged To Maintain Sidewalks, Squares, Parking Lots And Transport Stops During The Winter And Empty Trash Bins On The Basis Of The Contract Concluded With The Ordering Party. The Works Should Be Performed On All Working Days As Well As Weekends And Public Holidays.According To The Common Dictionary Of Public Procurement, The Contract Includes: Cpv 90620000-9 Snow Removal Servicescpv 90630000-2 Icing Removal Servicescpv 90511300-5 Garbage Collection Servicescpv 90610000-6 Street Cleaning And Sweeping Services Cpv 90511000 -2 Export Services Waste4.2. The Scope Of The Service Provided Will Include:4.2.1. Cleaning Sidewalks, Squares, Parking Lots And Transport Stops In The Following Way: 1) Removing Mud, Snow, Ice And All Other Dirt (Paper And Leaflets, Foil And Aluminum Packaging, Sand, Plant Remains: Leaves, Flowers, Branches Of Trees And Shrubs, Birds And Dog Feces, Cigarette Butts, Bottles And Cans Of Alcoholic Beverages) And Eliminating Slipperiness On The Ordered Area; The Assigned Area Should Be Kept Clean At All Times, 2) Slipperiness And Black Ice Should Be Eliminated Up To The Surface Hardened With Paving Slabs, Concrete Blocks Or Asphalt; The Removal Of Slipperiness In The Commissioned Area Should Be Done Using A 30% Sand-Salt Mixture, 3) Snow And Ice Should Be Removed To The Edges Of Pedestrian Routes Or Squares And Parking Lots, Creating Dumps While Maintaining A Minimum Of 80% Of The Width Of The Cleaned Surface; There Should Be Gaps In The Piled Snow On Sidewalks At The Level Of Pedestrian Crossings; It Is Unacceptable To Remove Snow From The Cleaned Area Onto The Adjacent Road, 4) Any Dirt Collected From The Contracted Area Should Be Taken To A Landfill, 5) No Grass Should Grow On The Contracted Areas, Especially Near Sidewalk Edges And Street Curbs, 6) The Contractor Shall Secure The Equipment And Sand And Salt On Its Own,7) The Contractor Is Fully Responsible For Any Accidents Occurring On The Commissioned Premises Resulting From Improper Maintenance, In Particular When The Cause Of The Incident Is Unremoved Black Ice Or Slipperiness.4.2.2. Emptying Street, Park And Bus Stop Bins In The Following Manner: 1) All Bins Should Be Emptied On An Ongoing Basis And Overfilling Is Unacceptable, 2) All Pollutants Within A Radius Of 5 Meters From The Bin Should Be Collected, 3) Pollutants Selected From The Bins And Around Them Should Be Taken To A Landfill, 4) In Winter, The Baskets And The Area Within A Radius Of 1 Meter Around Each Of Them Should Be Cleared Of Snow In A Way That Allows The Use Of Them,5) Baskets That Have Been Overturned Or Moved To Another Place Should Be Placed In Their Current Position,6) The Ordering Party Will Provide Bags For Dog Packages And Bags For Garbage Bins In Places Where Metal Inserts Are Devastated Or They Are Not Serviced For Other
|