Structural Shell Work – New Construction Of The Bad Lippspringe Thermal Outdoor Swimming Pool; Shell Construction Work. Afterwards A. D. After Extensive Demolition Work, The Construction Of A New Changing Room And Administration Wing Is Planned; The Building Will Be Built On The Site Of The Old Administration Building, The Old Toilet And Storage Building And The Pavement/Green Area In Between. The New Building Will House The Bathing Water Technology, Womens, Mens, Disabled Toilets, Changing Rooms And Showers, As Well As Staff And Club Rooms On An Area Of Approx. 750 M2. The Redesign Of The Swimming Facilities To The West Includes The Creation Of An Approximately 985 M2 All-In-One Stainless Steel Pool System. The New Pool Complex Includes A Diving Area With A Water Depth Of Approx. 4.00 M, Arranged In A South-Westerly Direction. The Jumper Area Covers An Area Of Approx. 105 M2 And Flows Northwards Into The Swimmer Area With A Water Depth Of 1.35 To 1.80 M. The Swimmers Area Covers An Area Of Approx. 570 M2 And Transitions Into The Non-Swimmers Area With A Water Depth Of 0.90 To 1.05 M Via A Rising Transition Area With An Area Of Approx. 55 M2. The Approximately 255 M2 Non-Swimmer Area Is Accessible To The East Over A 6.00 M Wide Area And Is Equipped With A Water Slide To The West. There Is An Approx. 40 M2 Wooden Deck As A Sun Deck Between The Non-Swimmer And Swimmer Areas. After Completion Of The Building Construction Work And The Completion Of The Stainless Steel Pool System, Work Will Follow To Renew The Outdoor Facilities. For The Redesign Of The Outdoor Facilities, The Pool Area Will Be Framed With Vegetation, And The Pool Area Will Then Be Made Accessible At Selected Points Via Walk-Through Pools. The Construction Of Several Outdoor Showers, Two Terrace Areas, A Deck And A New Lifeguards House Are Also Planned. Finally, The Areas Between The Vegetation Strip Surrounding The Basin Are Completely Paved. Mass Installation: Remove Topsoil Approx. 500 M2 Soil Excavation Approx. 4500 M3 Sewer Pipes Approx. 300 M Create Foundations Approx. 200 M3 (Strip And Individual Foundations) Create Solid Floor Slabs Approx. 300 M3 Pool Substructure Lean Concrete Approx. 130 M3 Create Solid Walls Approx. 200 M3 Manufacture Stb. Ceilings Approx. 200 M3 Reinforcing Steel Approx. 75 T Masonry Outside 24 Cm Approx. 750 M2 Masonry Inside 11.5/17.5/24 Cm Approx. 500 M2 Perimeter Insulation Approx. 350 M2
Contact Information
Contact No.
+49 525226168
Email
vergabestelle@paderborn.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 89984116
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.