Sanitary Works – Sanitary Engineering Ba 1. The City Of Puchheim Intends To Renovate The Middle School On Lagerstrasse In Puchheim. During The Renovation Of The Puchheim Middle School, The Entire Plumbing Installation Will Be Replaced. Sewage Pipes Are Made Of Sml And Plastic Pipe, Water Pipes Are Made Of Stainless Steel. To Ensure Drinking Water Hygiene, The Water Pipes Are Looped Through To The Last Tapping Point. A Forced Flush Is Installed At The End Of The Rod. Only Cleaning Rooms, Disabled Toilets And Kitchenettes Receive Hot Water. This Is Generated Using Electric Instantaneous Water Heaters. Furnishings Are Made Of Porcelain. Dry Urinals Are Used For The Urinals. Dimensions: - 255 M Sml Pipes Dn50 To Dn150 - 130 M Plastic Wastewater Pipe Dn50 To Dn100 605 M Va Water Pipe - 11 Pcs. Shut-Off Valves - 12 Pcs. Flow Dividers - 5 Pcs. Hygiene Flushing Devices - 37 Pcs. Toilet Systems - 30 Pcs. Washbasin Systems - 17 Pcs. Dry Urinals - 3 Pcs Drainage Facilities - 1 Disabled Toilet Facility - 2 Fire Brigade Feed Dry Fire Extinguishing Pipe - 8 Extraction Points Dry Fire Extinguishing Pipe - 100 M Dismantling Cast Iron Pipes - 90 M Dismantling Galvanized. Water Pipes
Contact Information
Contact No.
+49 89 800 98 555
Email
vergabe.hochbau@puchheim.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 89975614
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.