River Regulation And Flood Control Works - Structural Implementation Of Flood Protection Measures On The White Elster From Gera-Zwötzen To Gera-Liebschwitz, New Construction Of Flood Protection Wall 1.3 Ba. The Subject Of The Order Is Construction Work As Part Of The Measure “Structural Implementation Of Flood Protection Measures On The White Elster From Gera-Zwötzen To Gera-Liebschwitz, Construction Phase 1.3” For The Construction Of An Approximately 1.0 Km Long Flood Protection Wall As A Sheet Pile Wall With Concrete Cladding. The Contract For The Structural Implementation Of The Flood Protection Measures Essentially Includes The Following Services: Construction Site (Construction Site Equipment, Traffic Safety, Preparatory Work, Demolition And Safety Work, Demolition Work Regarding Concrete Demolition (Cap, Shaft Covers, Foundations, Etc.), Fences And Railings, Spectator Stands And Associated Staircases In The Stadium, Factory And Warehouse, Carports, Car Ramps, Lighting Poles, Existing Pavement (Asphalt, Unbound Cover Layer Etc.), Earthworks/Removal Of Dike Material And Recycling Or Disposal, Adjustments To Systems And Existing Pipelines (Private Systems, Zvme Systems, Building Demolition, Canoe System), Relocation Of Lighting Masts, Flood Protection System (Sheet Piling Work, Concrete And Reinforced Concrete Work, Road Construction Work, Crossings , Path Drainage, Angle Retaining Wall), Equipment (Railings, Street Furniture, Fences), Road Construction Work (Asphalt And Paving Work, Road Drainage, Media Laying, Street Lighting / Electrical Cables), Landscaping, Fishing And Evidence Preservation, Etc. Further Information On The Contract Service Can Be Found In The Tender Documents (Service Descriptions, List Of Services, Appendices, Drawings).
|