Heating Works – Civil Engineering Department, Modernization And Expansion. - Construction Of The System In The Technical Center Of The Carpentry Shop (Ba 1) - Heating Via Pellet Boiler (100 Kw) And Log Boiler (20 Kw) - Construction Of Pellet Storage Room Approx. 12M² (Suction Probes, Sloping Floor, Etc.) - Buffer Storage System Approx. 4400 L With Connection To A Pressure Maintenance Station - Connection Of 4 Heating Circuits (Underfloor Heating, Ventilation, Fresh Water Stations And Its Buffer Tank, Local Heating Network) - Connection Of Electric Heating Boiler To Buffer Storage For The Use Of Excess Pv Electricity - Heating Carpentry Via Underfloor Heating Approx. 346 M - Piping Network Made Of Stainless Steel And Insulation According To Geg Requirements - Separate Chimney Made Of Stainless Steel For The Boiler System Which Is Drawn Into A Shaft System. Both Systems Must Be Approved By Building Authorities - The System Receives Building Automation And Is Not Part Of This Service Description
Contact Information
Contact No.
+49 7211332693
Email
vergabe@hgw.karlsruhe.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 89926737
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.