In Art. 405 Par. 1, Art. 417, Para. 1 Of The Rules For Technical Operation Of The Railway Infrastructure Of The State Enterprise National Railway Infrastructure Company And In Art. 165, Para. 1 And Para. 4 Of The Rules For Current Maintenance Of The Railway, The Measurement Of The Railway And Facilities With Technical Means Is Regulated. Diagnostics Of The Railway Includes: Control Of The Geometric Parameters Of The Railway In A Loaded State And Video Control Of The Technical Condition Of The Elements Of The Upper Construction Of The Railway; Control Of The Gauge Using A Laser System For Measuring Distances From The Axis Of The Railway; Georadar Survey Of The Ballast The Prism, The Protective Layer, The Embankments And The Ground Base; The Total Length Of The Measured Sections For The Three-Year Term Of The Contract, The Number Of Annual Measurements, Types Of Railway Lines And Railway Junctions Are Detailed In The Technical Specification, Annex #1 To The Documentation.
Contact Information
Contact Person
Силвия Тодорова Тодорова
Email
s_todorova@rail-infra.bg
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 89913583
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.