Bridge Construction Work – B304 Bruecke Ueber Db Bei Strass. B16s.Bbbd0025.00.00 - Bridge Over Db Near Straß Short Description: With The New Replacement Building, The 2-Lane Federal Highway B 304 Will Be Routed Over The 2-Track, Electrified Db Route 5703. The Location Of The New Bridge Is Adjacent To The Existing Bridge, Which Will Be Demolished At A Later Date. It Is A Frame Structure Founded Flat (On Rock) With 5 Prefabricated Steel Composite Girders And An Inclination Of 50 Gon. The Demolition Of The Existing Structure And Road Construction Are Not The Subject Of This Measure. Main Masses: Reinforced Concrete: Approx. 1,600 M³ Reinforcing Steel: Approx. 230 Tons Vft Beams: 5 Pieces (5.3 Tons Of Structural Steel And 13 Tons Of Reinforced Concrete Slab, Length 16.5 M) Earth Masses: - Excavation (Mainly Rock Decomposition As Well As Weathered And Unweathered Rock): Approx. 5,800 M³ - Installation: Approx. 6,700 M³
Contact Information
Contact No.
000
Email
poststelle@stbats.bayern.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 89865911
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.