Railway-Track Maintenance Services - Diagnostics Of The Railway With A Track Measuring Laboratory For A Period Of Three Years. In Art. 405 Para. 1, Art. 417, Para. 1 Of The Rules For Technical Operation Of The Railway Infrastructure Of The State Enterprise National Railway Infrastructure Company And In Art. 165, Para. 1 And Para. 4 Of The Rules For Current Maintenance Of The Railway, Is A Regulated Measurement Of The Railway And Facilities With Technical Means. According To Appendix 1 Of The Rules For The Current Maintenance Of The Railway, The Same Is Subject To Periodic Measurement In A Loaded State (At Least Every 6 Months On The Main And Every 12 Months On The Secondary Railway Lines). Diagnostics Includes: 1. Control Of The Geometric Parameters Of The Railway In A Loaded State And Video Control Of The Technical Condition Of The Elements Of The Upper Construction Of The Railway. The Activities Will Be Carried Out According To A Schedule Prepared By The Contractor And Agreed With The Railway And Facilities Division, According To The Annexes For The Respective Year, And The Total Length Of The Measured Sections For The 3-Year Term Of The Contract Is 25,073,850 Km, Incl. .: Ivo Measurement: Main Railway Lines (Km) - First Year: 3 725,717, Second Year: 3 725,717, Third Year:3 725,717 Secondary Railway Lines (Km) - First Year: 851,110, Second Year: 851,110, Third Year: 851,110 Railway Junctions (Km) - First Year: 55,406, Second Year: 55,406, Third Year:55,406 Total For Ivo Annual Measurement - First Year: 4,632,233, Second Year: 4,632,233 Third Year: 4,632,233 Iiro Annual Measurement: Main Railway Lines (Km) First Year: 3,725,717, Second Year: 3,725,717, Third Year: 3 725.717 Total For Both Measurements (Km) First Year: 8 357,950, Second Year: 8,357,950, Third Year: 8,357,950 2. Gauge Control By Means Of A Laser System For Measuring Distances From The Axis Of The Railway. The Activities Will Be Carried Out According To A Schedule Drawn Up By The Contractor And Agreed With The Railway And Facilities Division, According To The Annexes For The Relevant Year, And The Total Length Of The Measured Sections For The 3-Year Term Of The Contract Is 13,730,481 Km, Incl. .: Ivo Annual Measurement: Main Railway Lines (Km) - First Year: 3 725,717, Second Year: 3 725,717, Third Year: 3,725,717 Secondary Railway Lines (Km) - First Year: 851,110, Second Year: 851,110, Third Year: 851,110 Total For 1St Annual Measurement: - First Year: 4,576,827, Second Year .: 4,576,827, Third Year: 4,576,827 2Nd Annual Measurement: Not Foreseen. Total By Years (Km) - First Year: 4,576,827, Second Year: 4,576,827, Third Year: 4,576,827 3. Geo-Radar Survey Of The Ballast Prism, Protective Layer, Embankments And Ground Base. The Activities Will Be Carried Out According To A Schedule Prepared By The Contractor And Agreed With The Railway And Facilities Division, According To The Annexes For The Respective Year And With A Total Length Of Survey For The 3-Year Term Of The Contract Of 300 Km, Including: Ground-Penetrating Radar Survey Will Be Carried Out For Selected Sections Of The Railway Network At The Request Of The Contracting Authority With A Length As Follows: Measurement Total (Km) - First Year: 100,000, Second Year: 100,000, Third Year: 100,000 In Connection With The Implementation Of Infrastructure Projects, Financed By European Funds And National Funding, In Remo
|