Multi-Dwelling Buildings Construction Work – Construction Of Multi-Family Residential Buildings With Infrastructure At Ul. Waryńskiego In Mikołów As Part Of Municipal Resources.. Execution Of Construction Works Consisting In The Construction Of Two Multi-Family Buildings, Four-Story, With A Basement, Adjacent To Each Other With One Of The External Walls, Visually Creating One Broken Shape With Land Development. There Are Three Service Premises Located On The Ground Floor Of The Buildings. Construction Works Should Be Performed In Accordance With The Attached Construction And Technical Documentation, Construction Permit No. Rdpb-0101/2023, Within The Time Specified In The Agreement. Area Covered By The Study: 12,229.70 M² Development Area Of The Designed Buildings: 1,658.33 M² Building Volume: 20,988.42 M³ Number Of Above-Ground Floors: 4 Number Of Underground Floors: 1 Height: 12.95 M Usable Floor Area Of Apartments: 4,004.81 M² Usable Area Of Premises Services On The Ground Floor: 201.02 M2 Scope Of Works: - Ensuring Removal Of Soil Without Contamination From The Construction Site To The Place Indicated By The Ordering Party To The Area Owned By The Mikołów Commune - Silesian Botanical Garden - Including Planting, - Cutting Down Trees That Conflict With The Investment, Along With Cutting Tree Logs Into Sections Of 2.2 M Or A Multiple Of This Length And Transporting The Spoil (Logs, Thick Timber, Chips Branches) To The Premises Of The Municipal Services Plant (Zuk) Mikołów. The Cut Tree Is The Property Of The Ordering Party, - Replacement Planting, - Ensuring Ornithological Supervision During Tree Felling, - Demolition Of Existing Retaining Walls Located Along Waryńskiego And Łącznika Streets To Krawczyka Street, And The Existing Concrete Slab Constituting A Remnant Of The Building Previously Existing In This Place, - Demolition Of The Existing Building Development Of The Area Colliding With The Investment - Existing Electrical Installation And Ks And Ksd Sanitary Sewage Installation, In Accordance With The Design Documentation, - Construction Of External Networks And Installations (Rainwater Drainage, Water Connection, Sanitary, Gas And Electric Sewage Systems), - Complete Development Of The Area, I.E. Two Garbage Shelters, A Fenced Playground, A Bicycle Path, Pedestrian Sidewalks, 87 Parking Spaces, Including 8 For The Disabled - For Residents And Customers Of Service Premises And The Hospital, Internal Road, Intersection To Krawczyka Street And Łącznika To Krawczyka Street, - Construction Of An Underground Rainwater Tank, - Construction Of Four-Story Buildings With Basements, Adjacent To Each Other On One Facade, With A Common Gas Boiler Room With A Total Number Of Apartments Of 75 - 28 Apartments In Building A And 47 Apartments In Building B, Along With Internal Installations And Equipment, - Preparation Of A Comprehensive Post-Construction Geodetic Inventory Of Completed Facilities, Networks And Connections, Along With Marking Them On A Resource Map Surveying - Preparation Of An Energy Performance Certificate And Obtaining An Occupancy Permit. Attention ! The Equipment, Devices And Materials Provided Must Be New. The Works Should Be Carried Out In Accordance With The Building Permit Decision Rdpb-0101/2023 Of February 28
|