Construction Work For Highways, Roads – Design And Construction Of The A2 Motorway From The Biała Podlaska Junction To The Gr. States; Section Xi From Km Approx. 641+011 To The Dobryń Junction (With The Junction) At Km Approx. 650+287. The Order Includes In Particular: 1) Design Of The A2 Motorway On The Section From Km Approx. 641+011 To The Dobryń Junction (With The Junction) At Km Approx. 650+287 With A Cross-Section Of 2 Roadways With Two Lanes And An Emergency Lane With A Reserve For The Third Traffic Lane Outside The Road Crown, Along With Engineering Structures, Accompanying Infrastructure And Traffic Safety Devices, I.E. Development Of Design Documentation (Optimization), Technical Documentation And Post-Construction Based On The Requirements Of The Ordering Party Included In The Swz, 2) Obtaining On Behalf And For The Benefit Of The Ordering Party All Legally Required Opinions, Arrangements, Permits, Permits, Administrative Decisions Necessary To Design (Optimize) And Implement The Investment And The Occupancy Permit; 3) Implementation Of Works On The Section From Km Approx. 641+011 To The Dobryń Junction (With The Junction) At Km Approx. 650+287, In Particular The Following Construction Works Should Be Designed And Performed: A) Construction Of A Motorway, B) Junction Road Dobryń C) Construction Of Mop I Kijowiec Północ And Kijowiec Południe D) Reconstruction Of Existing Roads In Terms Of Collisions With The Motorway, Construction Of Additional Roadways, Restoring Damaged Road Connections And Ensuring Access To Properties, E) Infrastructure For Pedestrians And Cyclists, F) Emergency Crossings And Emergency Entrances To The Motorway, G) Service Lanes, H) Engineering Structures Along The Motorway And Along Roads Intersecting With The Motorway, I) Area Drainage System, Including Road Body Drainage Devices: Road Ditches, Rainwater Drainage, Pre-Treatment Devices, Retention Reservoirs, Retention And Infiltration And Others, J) Environmental Protection Devices, In Particular: Acoustic Protection, Animal Crossings, Ecological Culverts With Protective And Guiding Fencing, Highway Fencing, Greenery, Anti-Glare Screens, K) Infrastructure For Facilities Near The Highway, Including: Power Supply And Lighting Networks, Water Supply Networks, Sewage Treatment Networks And Devices, Storm Sewage Systems With Pre-Treatment Devices And Others, L) Reconstruction Of Colliding Devices And Networks Of Existing Underground And Above-Ground Infrastructure: Telecommunications And Energy Devices, Water Supply Networks, Rainwater And Sewage Disposal Systems, Gas Networks, Drainage, Hydrological And Other Devices, M) Demolition Of Structures Colliding With The Investment, Including Demolition Of Residential And Farm Buildings And Livestock As Well As Accompanying Infrastructure, N) Demolition Of Existing Surfaces, Including: Roads, Sidewalks O) Network Telecommunications For The Needs Of The Ordering Party, P) Road Lighting, Q) Traffic Organization, Including Road Safety Devices, R) Traffic Management System, S) Cleaning And Unblocking Existing Drainage Devices And Receivers For Effective Drainage Of Water From The Road, T) All Works Resulting From The Need To Connect Section X From The Biała Podlaska Junction (Without The Junction) To Km Approx
|