Construction Work - Construction Of A Sports Hall In Gödöllő Ii. Beat. A Sports Center Building Is Being Built In The Area Of The Gödöllő Premontrei Abbey, Connected To The Szent Norbert High School, The Construction Of The 1St Phase Of Which Has Been Completed. During The Construction Of The 2Nd Phase, The Building Must Be Fully Prepared. The Sports Center Building Can Be Divided Into Three Parts In Terms Of Function And Structure. The Two-Story Height Of The Eastern Sports Field, Which Is Partly Sunk Into The Ground, Is Covered By A Flat Roof Mounted On Long-Span Laminated-Glued Wooden Supports, While The Two-Story Mass Of The Western Swimming Pool Is Covered By A High Roof Built Partly On A Reinforced Concrete Coffin Slab And Partly On Laminated-Glued Wooden Beams. Between The Two Main Functions Are Service Functions Covered With A Flat Roof Installed On A Reinforced Concrete Slab. The Load-Bearing Structure Of The Building Is A Monolithic Reinforced Concrete Pillar Frame And Also Reinforced Concrete Walls. In The First Phase, The Supporting Structures And External Structures (Coverings, Heat And Waterproofing Structures, Facade Coverings And Windows) Of The Entire Sports Facility With A Net Useful Floor Area Of 4,515.3 M2 Were Completed. Multi-Functional Sports Field With Ceiling Height, Flexible Sports Covering, And The Corresponding Net 269.1 M2 Of Service Rooms, As Well As 396.3 M2 Of Traffic And 264.3 M2 Of Mechanical Rooms, Resulting In A Usable Floor Area Of 1931.5 M2 , As Well As The Traffic Surfaces Around The Building Have Been Completed 879.1 M2 Pool Area With Two Pools With A Total Net Water Area Of 429.5 M2, As Well As The Associated 607.4 M2 Service, 11.7 M2 Mechanical And 643.9 M2 Traffic Rooms Foiled Pool To Be Renovated As A Beach. A 1.1 Meter Deep Teaching Pool And A 25 Meter Long 4-Lane Swimming Pool. The Pool Area Is Also Connected To The Swimming Instructors Room And Medical Room, Barrier-Free Changing Room, And A Wellness Department. In The Latter, The Saunas And Steam Cabins Are Not Yet Ready, Only The Design Of The Rooms To Be Occupied Has To Be Completed. Between The Sports Hall And The Swimming Pool Is The Service Area, Which Was Only Partially Completed In The First Phase. The Upstairs Reception Hall Must Be Built Ready, With The Associated Cash Register, Cloakroom, Washrooms, And Service Rooms. New Doors And Windows Must Be Made From The Area To Access The Stands Of The Sports Hall. The Reception Hall Is Separated From The Swimming Pool Area By A Fireproof Glass Wall. An Accessible Elevator Must Be Installed In The Elevator Shaft Completed In The First Phase. During Construction, The Swimming Pool Machinery, The High And Low Current Systems Of The Common Areas Of The Gymnasium And Swimming Pool Area And The Swimming Pool Rooms Must Be Built. The Pools Need To Be Renovated. The Starting Stones, Lane Markings, And Separation Belonging To The Swimming Pool Must Be Placed
Contact Information
Address
Takács Menyhért Út 1
Contact No.
+36 305655126
Email
magyari.levente@prem.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 89802742
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.