Junior Construction Civil Engineer With Additional Charges, Construction Master With Additional Charges, Occupational Safety Technician With Additional Charges, Night Watchman With Additional Charges, Day Watchman With Additional Charges, 12/09/2024, Storekeeper With Additional Charges, Supply And Installation Of Work Plate With Galvanized Sheet And Structure Wood. Af_03/2022_Ps, Open Shed To Support Production (Carpentry, Armature Center, Workshop, Etc.) W/ Scissors, 4Mm Tile, Bleached Concrete Floor, Location Of Container 2, 30 X 4, 30 M, Height 2, 50 M, For Sanitary, With 3 Basins, 4 Showers, 1 Washbasin And 1 Urinal (Does Not Include Mobilization/Demobilization), 30 Includes Mobilization/Demobilization), Mobilization And Demobilization Of Container, Including Loading, Unloading And Transport In Truckbodywork With Crane (Munck), Exclusive Container Rental (Un), Demobilization Of Reinforcement Center On Construction Site (93582 Adapted Sinapi) (M2), Demobilization Of Formwork Center On Construction Site Work (93583 Adapted Sinapi) (M2), Conventional Work Location, Using Jig Of Pointed Running Boards Every 2.00M - 2 Uses. Af_03/2024, Siding With Metallic Tile. Af_03/2024, Demolition Of Simple Concrete Floor, Mechanized Using A Hammer, Without Reuse. Af_09/2023, Demolition Of Cobblestone Or Pre-Cast Concrete Paving With Reuse, Demolition Of Guides, Gutters Or Gutters, Mechanized, Demolition Of Reinforced Concrete Pillars And Beams, Demolition Of Mortared Stone Retaining Wall, Demolition Of Masonry For Any Type Of Block, Manual Cleaning Of Vegetation On Land With Hoe. Af_03/2024, Demolition Of Reinforced Concrete Slabs, Manually, Removal Of Metallic And Ceramic Fibercement Tiles, Mechanized Excavation Of Trench With Prof. Up To 1.5 M (Average Upstream And Downstream/One Composition Per Section), Excavator (0.8 M3), Width. Less Than 1.5 M, On Soft Ground, In Places With A High Level Of Interference. Af_02/2021, Manual Excavation Of Trench With A Depth Of Less Than Or Equal To 1.30 M. Af_02/2021, Mechanized Excavation For Crowning Block Or Footing With Backhoe Loader (Without Excavation To Place Formwork). Af_01/2024, Mechanical Soil Compaction For Execution Of Radier, Concrete Floor Or Slab On Soil, With Percussion Soil Compactor. Af_09/2021, Preparation Of The Bottom Of A Trench With A Width Greater Than Or Equal To 1.5 M And Less Than 2.5 M (Natural Soil Adjustment). Af_08/2020, Manual Trench Backfilling, With Percussion Soil Compactor. Af_08/2023, Mechanized Trench Backfilling With Hydraulic Excavator (Bucket Capacity: 0.8 M³/Power: 111 Hp), Width Up To 1, Depth From 1.5 To 3.0 M, With Soil (Without Replacement) Of 1St Category, Mechanized Trench Backfilling With Hydraulic Excavator (Bucket Capacity: 0, Width Up To 2, Depth Up To 1, With Sand For Landfill. Af_08/2023, Loading, Maneuvering And Unloading Soil And Granular Materials In 6 M³ Dump Truck - Loading With Loader (1.7 Bucket At 2.8 M³ / 128 Hp) And Free Discharge (Unit: M3). Af_07/2020, Transport With 14 M³ Dump Truck, On Paved Urban Road, Dmt Up To 30 Km (Unit: M3xkm, Af_07/2020, Cost Of Waste Treatment In Appropriate Location, According To Leg).
|