tender for Rehabilitation Of 3.6 Mld Waste Water Treatment Plant And Associated Sewage Pumping Station With Defect Liability Period 1 Year For Civil Works And 2 Year Em Works After Completion Of Work And Operational And Maintenance For 3 Years At The Kasna Ind, Rehabilitation of 3.6 MLD Waste Water Treatment Plant with defect liability period 1 year for Civil works and 2 year E&M works after completion of work and Operational and maintenance for 3 years at the Kasna Industrial area, Guatam Buddha Nagar (Greater Noida), UP under deposit program on “TURNKEY” basis Sl. No. Item Description 1 SCHEDULE(G-1) 2 CIVIL WORK (CAPEX) INCLUDING 03 MONTHS TRAIL & RUN 3 DG House Paint & Rolling shutter:-Providing all labor, materials, tools, and equipment for the construction of a DG House as per the approved design and drawings, and under the direction of the Engineer-in-Charge (E/I), including all associated works, as directed by the Engineer-in-Charge. The work shall be executed in accordance with site conditions and requirements, ensuring proper and complete execution of the work. 4 ADMIN BUILDING:-Providing all labor, materials, tools, and equipment for the construction of the admin building, as per the approved design and drawings, and under the direction of the Engineer-in-Charge (E/I). The work shall be carried out in accordance with site conditions and requirements, ensuring complete and proper execution of the work. 5 Wetland with common wall and inlet, outlet channel (8 Channels, each 15.0 m X 8.0 m):-Providing all labor, materials, tools, and equipment for the construction of a wetland, as per the approved design and drawings, and under the direction of the Engineer-in-Charge (E/I). The work shall be executed in accordance with site conditions and requirements, ensuring that the construction of the unit meets all specified parameters and achieves the desired outcomes. 6 Wetland media consisting of Coarse Aggregate, Round Stone and Fine Aggregate:-Providing all labor, materials, tools, and equipment for the construction of a wetland, as per the approved design and drawings, and under the direction of the Engineer-in-Charge (E/I). The work shall be executed in accordance with site conditions and requirements, ensuring that the construction of the unit meets all specified parameters and achieves the desired outcomes. 7 Aggregate 40 mm 8 Sand 9 Round Stone 10 Mud mortar made with local clay good earth. 11 Lining HDPE Lining 12 Bottom 13 Walls 14 Supply of all labor, materials, tools, and equipment for planting shrubs or plants in the constructed wetland at 0.3 m center-to-center (C/C) spacing, as per the approved design and under the direction of the Engineer-in-Charge (E/I). The work shall be executed in accordance with site conditions to ensure proper completion and including all necessary components. 15 Supply of all labor, materials, tools, and equipment for providing Polycarbonate sheet, as per Requirementsite condition andthe approved design and drawings, and as directed by the Engineer-in-Charge (E/I). The work shall be executed in accordance with site conditions to ensure proper completion, achieving the desired parameters, and including all necessary components. 16 Misc. Repair Work:-Providing all labor, materials, tools, and equipment for minor and major repair works, including the strengthening of all existing structural units, as directed by the Engineer-in-Charge (E/I). The scope of work includes epoxy painting inside all liquid-retaining structures and other necessary painting tasks for all structures to ensure proper completion in accordance with site conditions and requirements, enabling the Sewage Treatment Plant (STP) to become fully functional and achieve the desired parameters. 17 Paint Work:-Providing all labor, materials, tools, and equipment for Painting works on, including all existing structural unit to construced New Units as directed by the Engineer-in-Charge (E/I). The scope of work includes painting inside all liquid-retaining structures and other necessary painting tasks for all structures to ensure proper completion in accordance with site conditions and requirements, enabling Wastewater Treatment Plant to become fully functional and achieve the desired parameters. 18 Water Proofing work :-Providing all labor, materials, tools, and equipment forWater Proofing work works, including the strengthening of all existing structural units, as directed by the Engineer-in-Charge (E/I). The scope of work includes epoxy painting inside all liquid-retaining structures and other necessary painting tasks for all structures to ensure proper completion in accordance with site conditions and requirements, enabling the Sewage Treatment Plant (STP) to become fully functional and achieve the desired parameters. 19 STORM WATER DRAIN:-Supply of all labor, materials, tools, and equipment for the construction of storm water drains, as per the approved design and drawings under the direction of the Engineer-in-Charge (E/I). The work shall be executed in accordance with site conditions to ensure proper completion and including all necessary components. 20 LABORATORY:-Supply of all labor, materials, tools, and equipment for tiling the laboratory slab (15 m x 0.8 m) along with skirting, including all internal rehabilitation works as directed by the Engineer-in-Charge (E/I). The work shall be executed as per site conditions to ensure proper completion and including all necessary components. 21 UV DISINFECTION:-Supply of all labor, materials, and tools & plant (T&P) for the construction and installation of the UV disinfection channel, as per the approved design and drawings, and as directed by the Engineer-in-Charge (E/I). The work shall be carried out in accordance with site conditions and requirements to ensure proper completion and achieve the desired parameters, including all necessary provisions. 22 Supply of all labor, materials, and tools & plant (T&P) for the construction of the Overhead Tank for the water supply facility throughout the entire premises, as directed by the Engineer-in-Charge (E/I). The work shall be executed in accordance with site conditions and specifications to ensure proper completion, including all necessary provisions. 23 GRASS CUTTING:-Providing all labor, materials, tools, and equipment for grass cutting and site cleaning as directed by the Engineer-in-Charge, ensuring proper completion of the work in accordance with site requirements, including all necessary measures. 24 ELECTRICAL, MECHANICAL, INSTRUMENTATION AND SCADA WORK (CAPEX) INCLUDING 03 MONTHS TRAIL & RUN 25 Rehabilitation, upgradation, Design, drawingfor 3.6 MLD existing Waste water Treatment Plants (WWTP)and its asssociated SPS, based on ASP and MBBR technologyconsisting of supply, installation, testing and commissioning of allmechanical, Electrical, Instrumentation, PLC -SCADA system including Manual screen, mechanical fine screen with differential level sensors,belt conveyer, vortex grit removal system with conveyar & grit container, screeingcontainer, Anoxic tank mixer, Air blowers, diffusers, recirculation & excess sludge system, UV disinfection system, filtrate pumping system, centrifuge feed pump, centrifuge, Poly dosing system, replacement of existing primary & secondary clarifier mechanized system, chlorine dosing system, automatic chlorine leak dedection & absroption system, labortary equipments, fire fighting equipments, fresh water bore well of 500 LPM with pumping plant , chlorine contact tank,MCF & ACF filters, CCTV cameras,arrangement forlaboratory for measurement of various parameters of untreated and treated effluent etc. D.G. set and all other relevant equipments required for prper completion of the work. The work also includes provision for treated waste water to the drain(if required as per the site requirement) and also includes providing street lighting in campus complete in all respects as per specifications and directions of Engineer-in Charge. continue below to next row ------- 26 part of above cell--------In addition to this testing laboratory with equipment shall be constructedas per the specification along with Online Analyzer. andOperationandmaintenancecostfor STP and associated SPS, other works createdunderthecontract for successfully completion of the work and including cost of power connections, substation of required load at SPS and STP which is also in contractor scope. The works includes 03 Months Trail & Run, defectliabilityperiodof24monthswhichincludesbasicservicechargeshavingexpenditureandexpensesrequiredtobeincurredonlabour,repairand/orreplacementofmaterials,equipments,consumableitems,waterandallothermattersanditemsofwhatsoevernature,essentialanddesirabletorunthesystemsatisfactory,AdministrationandManagement,RunningofOffice,ComprehensiveOperation,MaintenanceandRepairsincludingPreventiveMaintenance,Consumables on Turnkey basis (This is excluding electric power cost of which shall be borne by the Authority) at Kasana Indusrial Area Gautam Buddh Nagar (Noida). Diesel for 03 Months Trail & Run include in contractors scope. The scope of works includes replacement of all existing electromechanical equipments.The capacity and quantity of the equipments will be determined by the bidder as per CPHEOO manual to achive the desired parameters. The P&ID diagram is also submit by the bidder 27 Supplying, installation, testing and commissioning of energy efficient central AC Plant for buildings including Ducting work, all associated work as per approved drawing by concerned engineer incharge and direction of engineer incharge. 28 Supplying, installation, testing and commissioning of energy efficient LED street lighting system with GI poles for sewage pumping stations and STP campus including 02 Nos high mast lighting system each have 04 Nos. 100 watt all in one compact solar LED lights 29 03years operation & Maintenance on design build and oparate (DBO) basis for STP and Associated sewage pumping stations. 30 1 st Year 31 Chlorine @ 25 Kg/day 32 Dewatering Ploymer @ 1.20 Kg/day 33 Staff & Manpower- Plant Manager, Chemist/Analyst, Mechanic/Fitter, Electrician, Helper, Gardener, Sweepers, Watchmen etc. for all shifts 34 Maintenance - Civil works 35 Maintenance - All Mechanical, Electrical, Instrumentation& SCADA Equipments at STP and associated sewage pumping stations. 36 2 nd Year 37 Chlorine @ 25 Kg/day 38 Dewatering Ploymer @ 1.20 Kg/day 39 Staff & Manpower- Plant Manager, Chemist/Analyst, Mechanic/Fitter, Electrician, Helper, Gardener, Sweepers, Watchmen etc. for all shifts 40 Maintenance - Civil works 41 Maintenance - All Mechanical, Electrical, Instrumentation& SCADA Equipments at STP and associated sewage pumping stations. 42 3 rd Year 43 Chlorine @ 25 Kg/day 44 Dewatering Ploymer @ 1.20 Kg/day 45 Staff & Manpower- Plant Manager, Chemist/Analyst, Mechanic/Fitter, Electrician, Helper, Gardener, Sweepers, Watchmen etc. for all shifts 46 Maintenance - All Civil works 47 Maintenance - All Mechanical, Electrical, Instrumentation& SCADA Equipments at STP and associated sewage pumping stations.
|