Construction Work – Energetic Renovation Of Elte Trefort Buildings. The Subject Of This Procurement Is The Energetic Renovation Of The 6 Buildings Of The Elte Trefort Garden Campus (Buildings Marked A, B-C; D; F, I, K). According To The Technical Content Of The Design Concept, The Degree Of Reduction In Annual Primary Energy Consumption Expected: Trefort Garden The Building: 1,320,000 Kwh/Year Trefort Garden B-C Building: 1,380,000 Kwh/Year Trefort Garden Building D: 1,390,000 Kwh/Year Trefort Garden Building F: 940,000 Kwh/Year Trefort Garden I Building: 765,000 Kwh/Year Trefort Garden K Building (Main Building): 3,080,000 Kwh/Year The Building Affected By The Investment: The Trefort-Kert Campus, Home To The Faculty Of Arts, Is At 4-6-8 Múzeum Körút. And Puskin Utca 3 And 11-13 Located At No. There Are Nine Building Units On The Property. Of These, Buildings B-C And H-D Form A Free-Standing Building Unit. The Building Marked A Is A Free-Standing, Listed Building, Listed Number: 15646. The Main Building (K) And Building F Are Directly Connected To The Building On The Neighboring Property. Building I Is Partially Connected To Neighboring Buildings On Two Sides. Building Structure Characteristics: The Building: Level Number: 6 (Basement + Ground Floor + 4 Floors), Foundation: Bar Base, Load-Bearing Structure: Masonry Structure B-C Building: Level Number: 4 (Basement + Ground Floor + 2 Floors), Foundation: Bar Base, Load-Bearing Structure: Masonry Structure Building D: Level Number: 4 (Basement + Ground Floor + 2 Floors), Foundation: Bar Base, Load-Bearing Structure: Masonry Structure Building F: Level Number: 4 (Basement + Ground Floor + 2 Floors), Foundation: Bar Base, Load-Bearing Structure: Masonry Structure I Building: Level Number: 4 (Basement + Ground Floor + 2 Floors), Foundation: Bar Base, Load-Bearing Structure: Masonry Structure K Building: Level Number: 4 (Basement + Ground Floor + 2 Floors), Foundation: Bar Base, Load-Bearing Structure: Masonry Structure Summary Technical Content Of The Complex Building Energy Renovation: Building Mechanics And Building Electricity: • Replacement Of Boilers In Buildings D And K • Placement Of Heat Pumps On The Flat Roof Of Building D • Replacement Of Heating Circulation Pumps With Speed-Controlled Pumps A; B-C; F; In The Case Of I Buildings • Further Sectioning Of The Heating System With New Circuits And Cut-Off Fittings As Required According To The Possibilities Provided By The Current Heating Route A; B-C; D; In Buildings F • Heat Quantity Measurement A; B-C; D; F; I Buildings, Which At Least Gives The Opportunity To Break Down Energy Consumption At The Building Level. • Placing Thermovalves On Radiators D; F; In Buildings I And K • Replacement Of The Air Handlers In Building I With Machines With Higher Efficiency Heat Recovery, Insulation Of Attic Supply And Exhaust Air Ducts, Thickening Of Existing Insulation, Supply Of Heating Energy For Air Handlers With Heat Pumps • Replacement Of The Building Monitoring System In The Buildings Affected By The Modernization (The Planned System Must Be Expandable Even For All Elte Buildings
|