Construction Work – Construction Of The Bypass Of Szczekociny And Goleniowy Along National Road No. 78. 1. The Task Will Be Implemented In The Buduj System. 2. The Scope Of The Order Includes The Construction Of A Bypass For The Towns Of Szczekociny And Goleniowy Along National Road No. 78, Including: - Reconstruction Of Existing Roads In Terms Of Collisions With The Bypass, - Construction Of A Road Junction At The Intersection With Dk46, - Construction Of Sewered Roundabout Intersections, - Construction Of A Canalized (Ordinary) Intersection With Dw795, - Construction Of Engineering Structures, - Construction Of Roads Other Than The Bypass (Including, Among Others, Changing The Route Of Existing Roads, Construction Of Additional Roadways - Roads Serving Areas Adjacent To The Investment And Restoring Damaged Road Connections), - Construction And/Or Reconstruction Of Infrastructure For Pedestrians And Cyclists, - Construction And/Or Reconstruction Of Two Bus Bays And Construction Of Two Bays For Checking And Weighing Vehicles, - Construction Of Emergency Entrances To The Bypass, - Construction Of An Area Drainage System, Including Road Body Drainage Devices Such As: Storm Sewage, Pre-Treatment Devices, Retention, Retention And Infiltration Tanks And Others - Strengthening The Subsoil To The Extent Adapted To The Soil And Water Conditions, - Construction Of Environmental Protection Devices, Including: Acoustic And Anti-Glare Screens, Animal Crossings, Road Fencing, Pre-Cleaning Devices Rainwater, Planting Greenery, - Reconstruction Of Conflicting Devices And Networks Of Existing Underground And Above-Ground Infrastructure: Telecommunications And Energy Devices, Networks Water Supply, Stormwater And Sanitary Sewage Systems, Gas Networks, Drainage And Hydrological Devices, Railway And Other Devices, - Demolition Of Buildings And Structures, - Construction Of A Telecommunications Network For The Needs Of The Ordering Party, - Construction Of Road Lighting, - Construction Of Road Safety Devices: Marking Of The Bypass And Related Roads , Traffic Lights, Protective Barriers, Anti-Glare Shields And Ring Road Fencing. 3. The Order Will Be Implemented Based On The Conditions Of The Construction Contract For Construction And Engineering Works Designed By The Ordering Party. Association Of Engineers, Advisors And Appraisers Sidir, 1St Polish Edition 2019. Translation Of The Second English Edition Of Fidic 2017 (Fédération Internationale Des Ingénieurs-Conseils) [Isbn 978-2-88432-084-9] With Errata 1 (Amendment Edition: December 2018 R., June 2019 November 2022) And Errata 2. 4. Estimated Value Of The Order Above Eur 20 Million. 5. The Ordering Party Does Not Reserve The Obligation For The Contractor To Personally Perform Key Tasks.
|