Metalworking – Metal Construction Work, Locksmith Work, Installation Of A Jump Shaft System. House 1 Is Part Of The Berlin Fire Departments Property In Nikolaus-Gross-Weg, In The Immediate Vicinity Of The Spree And The Motorway Ring Road, In The Western Part Of The City. The Building Has Two Floors (Ground Floor, First Floor) And A Good Quarter Of It Has A Basement. On The Ground Floor There Are Useful Rooms Such As It, Telecommunications Room And Storage And Functional Rooms, As Well As The Vehicle And Reserve Hall. Due To The Construction-Related Height Of The Vehicle Hall, There Is A High Cavity Above The Suspended Ceiling On The Ground Floor. All Fw Staff Rooms Such As Offices, Canteen, Rest Rooms, Training Rooms, Changing Rooms, Sanitary Rooms And Lounges Are Located On The Upper Floor. The Building Is Closed Off At The Top By A Flat Roof. The Supporting Structure Consists Of A Reinforced Concrete Skeleton Construction With Staka Ceilings. In Addition, The Load-Bearing Supports And The Stairwell Walls Are Solid Reinforced Concrete Constructions, And Most Of The Room Partitions On The Upper Floor Are Light Rabitz Walls (7-10Cm Thick) With Spray Plastering. Due To The Excessive Ceiling Height, The Walls On The Ground Floor Are Predominantly Made Of Solid Brick. There Will Be A Total Dismantling Including Removal Of Pollutants Down To The Reinforced Concrete Skeleton Structure. The Building Shell Is Being Renovated To Improve Energy Efficiency In The Form Of A Prefabricated, Suspended Facade Made Of Wooden Frame Elements, Including The Replacement Of All Windows And Doors, The Replacement Of Many Vehicle Hall Doors, The Renewal Of The Roof Structure Including The Raising Of The Parapet. All Interior Areas Including The Entire Technical Building, Including The Installation Of An Exhaust Gas Extraction System, A Light Liquid Separator (Lfa), And A Bma, Will Be Renovated Primarily Using Dry Construction. The Existing Reserve Hall Will Be Converted Into A Continuous Vehicle Hall. The Building Under Consideration, House 1, Has A Gross Floor Area Of 2,752M2 (Including Basement), 2 Full Floors And A Total Volume Of 11,603M3. Gfa Basement: 287.55M2 Gfa Ground Floor: 1,186.74M2 Gfa Upper Floor: 1,277.88M2 According To Building Regulations, The Building Is Assigned To Building Class Iii, With Special Building Requirements. The Building Is Not Listed On The Monument List. The Services Advertised Here Include The Trades: - Metal Construction Work They Have The Following Essential Scope: - Delivery And Assembly Of A Slip Shaft Element For The Fire Brigade Including A Slip Bar
|