Construction work of 1 additional class room in Ward No. 08 Primary School Mudisemar - EXCAVATION in foundation in ordinary Soil ( Loam clay or sand ) including lift upto 1.5m lead upto 30.0 m & including filling watering and ramming of excavated earth into the space between the building & sides of foundation trenches or into the plinth and removal & disposal surplus earth as directed by the engineer I/C within a lead of 30m.from foundation trenches. 2 Sand filling in plinth including supply of necessary quantity of sand from a distancenot exceeding 8.00Kms. From the site of work including watering, dressing etc. labour & T &P etc. required for proper completion of work saplings of girth upto 30 ground level and removal of rubbish upto a distsnce of 50m out side the periphery of area cleared. under floor fine sand 3 Providing and laying Cement concrete 1:4:8 (1cement :4 coarse sand :8 graded stone ballast 40 mm. nominal size) including supply of all materials, labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. 4 R.C.C. work with cement approved coarse sand and 2 cm Gauge approved stone ballast in the proportion of 1:1.5:3 in Foundation & raft, excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc and also including supply of all materials, labour and T&P etc. required for proper completion of the work. Binding wire cost beingincluded in the item. 5 R.C.C. work with cement approved coarse sand and 2 cm Gauge approved stone ballast in the proportion of 1:1.5:3 in Plinth/Grid beam, excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc and also including supply of all materials, labour and T&P etc. required for proper completion of the work. Binding wire cost beingincluded in the item. 6 R.C.C. work with cement approved coarse sand and 2 cm Gauge approved stone ballast in the proportion of 1:1.5:3 in Plinth/Grid beam, excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc and also including supply of all materials, labour and T&P etc. required for proper completion of the work. Binding wire cost beingincluded in the item. 7 R.C.C. work with cement approved coarse sand and 2 cm Gauge approved stone ballast in the proportion of 1:1.5:3 in SLAB, excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc and also including supply of all materials, labour and T&P etc. required for proper completion of the work. Binding wire cost being included in the item. 8 R.C.C. work with cement approved coarse sand and 2 cm Gauge approved stone ballast in the proportion of 1:1.5:3 in Heavier beam, excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc and also including supply of all materials, labour and T&P etc. required for proper completion of the work. Binding wire cost being included in the item. 9 R.C.C. work with cement approved coarse sand and 2 cm Gauge approved stone ballast in the proportion of 1:1.5:3 in colums, excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc and also including supply of all materials, labour and T&P etc. required for proper completion of the work. Binding wire cost being included in the item. 10 Class-150 brick work in 1:6 cementand Coarse sand mortar in foundation and plinth including supply of all materials, labour tools and plants, etc.Required for proper completetion of the work. 11 Providing and laying autoclaved aerated cement blocks masonry with 150mm/230mm/300 mm thick AAC blocks in super structure above plinth level up to floor V level with RCCband at sill level and lintel level with approved block laying polymer modified adhesive mortar all complete as per direction of Engineer-in-Charge. (The payment of RCC band and reinforcement shall be made for seperately). fly ash bricks 12 Mild steel or iron plain work such as reinforcemed concrete or reinforced brick work (when not included in over all rates) wrought to required shape as necessary bending,and also including supply and hooks requied for completion of the work. 13 Providing and fixing bright finished brass 100 mm mortice latch and lock with 6 levers and a pair of lever handles of approved quality with necessary screws etc. complete. 14 Providing and fixing SS tower bolts ISI marked anodised transparent or dyed to required colour or shade with necessary screws etc. complete : 250x10mm. 15 25 mm thick (for cupboard) including ISI marked nickel plated bright finished M.S. piano hinges withnecessary screws 16 35 mm thick including ISI marked Stainless Steelbutt hinges with necessary screws 17 Mild steel or iron work of small size and sections such as holding down bolts, hold fast, tie rods, grating etc, (when not included in an overall rates) wrought to required shape as necessary for bending etc including supply fo steel and its wastage including cost of bolts, nuts if required, welding, grinding and making holes as required for completion of work but Fabrication of Grill/Stairs case railing 18 Fixing with 15x3 mm lugs 10 cm long embedded in cement concrete block 15x10x10 cm of C.C. 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 19 Providing & fixing glass panes with putty and glazing clips in steel doors, windows, clerestory windows, all complete with 4.0 mm thick glasspanes 20 Providing and fixing T-iron frames for doors, windows and ventilators of mild steel Tee-sections, joints mitred and welded with 15x3 mm lugs 10cm long embedded in cement concrete blocks 15x10x10 cm of 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) or with wooden plugs and screws or rawl plugs and screws or with dash fastener or with fixing clips or with bolts and nuts as required including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer. 21 Providing & fixing fly proof wire gauze to windows, clerestory windows & doors with M.S. Flat 15x3 mm and nuts & bolts complete. Stainless steel (grade 304) wire gauze of 0.5 mm dia wire and 1.4 mm aperture on both sides. 22 FLOOR GR. 23 FLOOR 1/TERRACE 24 FLOOR GR. 25 FLOOR 1/TERRACE 26 15 mm cement plaster on rough side of single orhalf brick wall of mix: 1:4 (1 cement: 4 coarse sand) On plinth. 27 making groove 10 to 12 mm wide and x8 mm deep in plater ofthe wall or in ceiling vertrically orhorizontally as required. 28 Add for plaster drip course in plastered surface or moulding to R.C.C. projections 29 Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20 mm nominal size stone aggregate (without base concrete) 30 Cement plaster skirting up to 30 cm height, with cement mortar 1:3 (1 cement : 3 coarse sand), finished with a floating coat of neat cement. 18 mm thick 31 Providing and fixing glass strips in joints of terrazo/ cement concrete floors. 40 mm wide and 4 mmthick 32 Distempering with oil bound distemper of approved brand and manufacture and of required shade on undecorated wall surface to give an even shade over and including a priming coat with cement primer of approved brand and manufacture such as Berger, J&N Shalimar, Asian Paints after thoroughly brushing the sufface free from mortar dropping and other forein matter and also including prepairing the surface even and sand papered smooth including cost of all material. 33 Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade : New work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm) 34 Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. 35 Painting two coats over priming coat on steel & other metal surface upto 10 cm width or grith or small articles not exceeding 0.10 sqmt. In areas with superior synthetic enamel such as Luxol 3Hi gloss aqcolite superlac. Dulux specified finishing 36 Painting two coats over priming coat on Wood surface upto 10 cm width or grith or small articles not exceeding 0.10 sqmt. In areas with superior synthetic enamel such as Luxol 3Hi gloss aqcolite superlac. Dulux specified finishing 37 Making plinth protection 50 mm thick of cement concrete 1:3:6 (1 cement: 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and groutedwith fine sand, including finishing the top smooth. 38 E/work in excavation in fondation in mixedsoil i/e Disposal of surplus earth 3 km distance.
|