Coordination And Production Team – Type 3: Hiring A Coordination Team Consisting Of 01 (One) General Coordinator And 04 (Four) Production Assistants To Coordinate The Assembly And Disassembly Of The Entire Infrastructure. Musical Performances, Security, Dressing Room, Stage, Box, Sound System, Lighting, Generator, Logistics And Other Necessities Before, During And After The Event Period (Team/Day). / Service Will Start At Least One Day Before The Start Of The Opening Date And Will End One Day After The End Of The Event Or Until The Correct End Of The Service. / Including All Civil And Criminal Liability, Possible Moral And Material Damages To Third Parties, Expenses With Fees, Taxes, Charges, Personnel, Transportation, Accommodation And Food. / Every Service Must Be Provided With Excellent Quality, Education In Service And Safety., Support Personnel: Hiring Uniformed Personnel To Carry Out Support Services. Riot Containment, Street Isolation, Access, Reserved Areas, With Experience In Large Events. / Service Will Start At Least Two Hours Before The Start Of Opening Hours And Will End Two Hours After The End Of The Event. / Including All Civil And Criminal Liability, Radio Communication: Rental Of Radio Communicator. Walk Talk Type, Range Of 3 Km, 10 Frequencies, Minimum Operating Capacity Of 12 Hours, Digital Display, Battery, Charger, Holder Bag And Headset., Presentation: Hiring A Professional Presenter With Ceremonial Experience. To Conduct And Present The Musical Attractions, Authorities, Guests And Other Necessary Information During The Event Period. / Service Will Start At Least One Hour Before The Start Of Opening Hours And Will End Together With The End Of The Event. / Including All Civil And Criminal Liability, Foremanship: Hiring Personnel To Carry The Equipment Of The Musical Attractions From The Vehicle To The Stage And Vice And Versa At The Beginning And End Of Each Performance. Or When Necessary, Production Being Available Throughout The Entire Period Of The Event. / Service Will Start At Least Two Hours Before The Start Of Opening Hours And Will End Two Hours After The End Of The Event Or Until The Correct End Of The Service. / Including All Civil And Criminal Liability; All Material And Equipment Necessary To Execute The Services, 11/29/2024, Standard Chemical Bathroom: Rental With Assembly And Disassembly Of Chemical Bathroom. Stand Type, With Minimum Specifications: Portable Chemical Toilets, Female And Male (To Be Defined By Production), With Minimum Length Dimensions - 1.15M Width - 1.20M And Height - 2.30M. / With Waste Box, Toilet Seat (Female) And Urinal (Male), With Non-Slip Floor, Ventilation Point, Light Point, Translucent Ceiling, Latch On The Door With Internal Lock And Free/Busy Indication On The Outside, Paper Holder Hygiene And Support For Objects. / Includes Expenses For Transportation From The Bathrooms To The Event Location And Its Removal At The End, Daily Waste Removal And Internal And External Cleaning During The Event Period, Supply Of Toilet Paper, Biodegradable Sanitizing Chemical Solution, Disinfectants And Other Supplies In Quantities Enough To Meet Daily Needs. / Accompanied By A Maintenance Team Throughout The Day, Chemical Bathroom For Ported
|