Local Administration., Supply And Installation Of Workplate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Rental Of Container With Thermal Insulation, Type 3, For Warehouse/Construction Tooling, With Reference Measurements Of (6) Meters Length, (2, 3) Meters Width And (2, 5) Meters Internal Useful Height, Including Internal Electrical Connections, Exclusive Mobilization/Demobilization And Temporary Connections External., Mobilization And Demobilization Of Container, Including Loading, Unloading And Transport In Truck Body With Crane (Munck), Exclusive Container Rental., Protection Siding For Passersby Made Of Polyethylene Mesh, With Module In Dimensions Of (150X150)Cm, Including Tip With Support Base In Slim Concrete, Supply And Movement., 11/28/2024, Electrical Installations Project., Executive Project For Structured Cabling Infrastructure/Cctv/Alarm/Security/Sound., Hydraulic And Sanitary Installations Project., Fire Fighting Prevention Project And S31 Inclusive Approval From The Fire Department., Structural Calculation Project., Demolition Of Masonry Perforated Block, Manually, Without Reuse. Af_09/2023., Demolition Of Ceramic Coating, Demolition Of Reinforced Concrete Slabs, Mechanized Using A Hammer, Manual Removal Of Metal Frames, With Reuse, Including Frame/Alizar/Fittings, Removal And Stacking, Exclusive Transport And Removal Of Material Removed Not Reusable., Manual Tile Removal In Fiber Cement, Corrugated Type, Including Spacing And Stacking, Manual Removal Of Crates For Metal, Pvc Or Fiber Cement Tiles, Removal Of Crockery, Horizontal Transport With A 90 L Bottle, In Bulk/Bulk (Unit: M3xkm). Af_07/2019.., Loading, Maneuvering And Unloading Debris In A 6 M³ Dump Truck - Loading With Hydraulic Excavator (0.80 M³ / 111 Hp Bucket) And Free Unloading (Unit: M3). Af_07/2020.., Transport With 10 M³ Dump Truck, On Paved Urban Road, Dmt Up To 30 Km (Unit: M3xkm). Af_07/2020.., Conventional Lease Of Work, Using Template Of Pointed Running Boards Every 2.00M - 2 Uses. Af_03/2024.., Manual Excavation For Crowning Block Or Footing (Without Excavation For Placing Formwork). Af_01/2024.., Manual Excavation For Baldrame Beam Or Running Shoe (Without Excavation To Place Formwork). Af_01/2024, Mechanical Soil Compaction For Execution Of Radier, Concrete Floor Or Slab On Soil, With Vibrating Plate Type Soil Compactor. Af_09/2021., Slim Concrete Ballast, Applied To Floors, Slabs On Ground Or Radiators, 3 Cm Thick. Af_01/2024.., Block Frame Using 8 Mm Ca-50 Steel - Assembly. Af_01/2024.., Block Frame Using 10 Mm Ca-50 Steel - Assembly. Af_01/2024.., Reinforced Concrete Structure Pillar Or Beam Frame Embedded In Sealing Masonry Using 5.0 Mm Ca-60 Steel - Assembly. Af_06/2022..., Concrete Fck = 25Mpa, Mixture 1:2, 3:2, 7 (In Dry Mass Of Cement/Medium Sand/Gravel 1) - Mechanical Preparation With Concrete Mixer 400 L. Af_05/2021..., Launching Using Buckets, Densification And Concrete Finishing In Structures. Af_02/2022.., Manual Trench Backfilling, With Percussion Soil Compactor. Af_08/2023.., Reinforced Concrete Structure Pillar Or Beam Frame Embedded In Sealing Masonry Using 10.0 Mm Ca-50 Steel - Assembly. Af_06/2022.., Conventional Concrete Structure Slab Frame
|