Boiler Installations – Restoration Of Resources In Plzeňská Teplárenská. The Subject Of The Performance Of This Public Order Is A Functional Work Consisting In The Realization Of All Deliveries Of Goods, Works, Services Connected With The Construction Of A Steam-Gas Cycle In The Teplárna Area And With The Construction Of A Steam-Gas Cycle And Hot Water Gas Boiler House In The Energetics Area Of The Contracting Authority. The Public Order Will Have The Character Of A Turnkey Delivery And Will Be Performed In Accordance With The Requirements, Conditions, Specifications And Other Data And Information Contained In Detail In Books A And B Of The Zd. Basic Scope Of The Work - The Contracting Authority Assumes The Following Basic Scope Of The Work In The Teplárna Area And In The Energy Area Constituting The Public Contract: A. Processing Of The Documentation Necessary For The Implementation Of The Work, In Particular The Documentation In The Scope According To Decree No. 131/2024 Coll., On Construction Documentation, As Amended, And Other Documentation, Including Supplier Documentation Necessary For Goods, Services And Other Activities Connected With The Implementation Of The Work, Including Its Testing, Commissioning And Handing Over To The Client, And B. Possible Demolition And Removal Of Existing Buildings , Networks And/Or Equipment At The Place Of Execution Of The Work, Including Necessary Related Relocations Of Existing Buildings, Networks And/Or Equipment Of The Contracting Authority, Which Must Not Be Affected By The Execution Of The Work, All In To The Extent Necessary For The Execution Of The Work, And C. Installation And Commissioning Of The Gas Turbine Including Accessories, And D. Delivery, Installation And Commissioning Of The Natural Gas Compressor Station, And E. Complete Construction Part, And F. Delivery, Installation And Commissioning Operation Of The Combustion Boiler, Including Related Construction Parts, Accessories And Piping, Electrical Wiring, All According To The Suppliers (Contractors) Proposal In Accordance With The Requirements Of The Tender Documentation, And G. Execution Of Follow-Up Services Related To The Work, Such As In Particular Coordination Works, Insurance, Procurement Of Decisions By Administrative Authorities Following The Execution Of The Work, Training Of The Clients Staff, Quality Control And Ensuring Health And Safety During The Execution Of The Work, And H. Supply And Commissioning Of The Control System Necessary For The Management Of The Entire Steam-Gas Cycle, Including Connection To The Information System The Contracting Authority, And I. Supply And Installation Of Electrical Substation Equipment And A Transformer Station For The Output Of Electrical Power To The Vvn Network. Furthermore, The Contracting Authority Assumes The Following Basic Scope Of Work In The Energetics Area Constituting The Public Order: J. Complete Delivery And Installation And Commissioning Of A Steam Condensing Turbine With Regulated Heat Intake And Output, Including Accessories And Pipe Connections, All According To The Proposal Of The Supplier (Contractor) In Accordance With The Requirements Of The Tender Documentation Including The Related Construction Part, And K. Supply, Installation And Commissioning Of A Chemical Water Treatment Plant In The Vicinity Of The Thermal Power Plant, And L. Construction And Commissioning Of A Fan Cooling Towers, And M. Complete Supply And Install
|