Wall-Covering Work – Nuremberg Nord Hospital – House 47 Plumbing And Heating Renovation - Drywall/Interior Plastering Work. The Heating And Plumbing Renovation Is Carried Out In Several Construction Phases During Ongoing Operations. For This Purpose, The Rooms In The Construction Phases To Be Renovated Are Cleared Either Completely Or In Sections, Depending On Requirements. A New Heating Center With A Connection To The District Heating Is Being Built In The Unused Attic. A New Pump Hot Water Distribution Network Will Be Installed Throughout The Building And The Existing Radiators Will Be Replaced. The Sanitary Cores And Kitchenettes Throughout The Building Will Be Renovated And The Cold And Waste Water Network Will Be Replaced. Drywall Construction: • Insulate The Interior Wall, Rock Wool Insulation Board, A1, Wls 040, D=10 Mm, Approx. 45 M² • Sloped Roof Cladding, Gkf, F-30, 20 Mm, Including Intermediate Rafter Clamping Felt And Vapor Barrier, Approx. 300 M² • Cladding, Wooden Supports, Central Purlins , Pliers, Gkf, F-30, 20 Mm, Approx. 125 Running Meter • Metal Single Stud Wall, Cw 75, Gkb, 2-Layer, D=125 Mm, Approx. 40 M². • Metal Installation Wall, Lashed, Cw 50, Gkb, 2-Layer, Up To D=325 Mm, Approx. 180 M² • Facing Panels, Cw 50, Gkb, 2-Layer, Up To D=350 Mm, Approx. 40 M² • Fold -Shaft Wall, 2-Sided Gkb, 1V Milling 90°, Glued, Approx. 25 Pieces • F-90 Wall, Approx. 40 M² • Ceiling Case, Gkb, Approx. 40 M² • Suspended Ceiling, Grid Ceiling, Insert System, Approx. 310 M² Interior Plaster: • Lime Gypsum Plaster, Inside, Single Layer, Q3, Stripped, Approx. 580 M² • Insulate Radiator Niches , Multipor, 40 Mm, Outside Wall, Incl. Reinforcement And Finishing Plaster, Approx. 115 M²
|