Installation Of Road Signs – Sanef Nord & Est - Pphm - Program 2025 Sanef Est - A4/A344 - Pphm Replacement Works For The Centers Of Coutevroult, Champagne-Reims And Vosges Du Nord. The Work Includes: • Start-Up Meetings And Site Meetings In Person Or Remotely, • Contradictory Layouts, Topographic Surveys By Surveyor And Execution Studies, • Production And Provision Of Layout Minutes And Calculation Notes, • The Dict To The Concessionaires Of The Buried Or Aerial Networks, • The Transmission Of Proof Of Deposit Of The Dict In The Form Of An Excel Spreadsheet Including The Geographical Location Of The Dict, The Date Of Sending, And The Identification Of The Recipient Organizations, • Marking Or Staking On The Ground To Indicate Buried Networks, • Possible Geotechnical Surveys Via An Approved External Organization, • Possible Dismantling (Sanef Validation) And Reassembly Of Retaining Devices For Access To The Storage Area Works, • The Implementation Or Modification Of Metal Retaining Devices To The Right Of Certain Assemblies In Accordance With The Requirements Of The Project And The Standards In Force, • The Modification Or Adaptation Of Concrete Retaining Devices, Including Connections With The Dr Metal And/Or With The Above Ground Mass And Possibly The Removal Of Covers Which Have Become Obsolete, In Accordance With The Requirements Of The Project And The Standards In Force, • The Implementation, The Shifting(S), The Lifting And The Evacuation Of Suitable Modular Track Separators, • The Possible Repair Of The Coating At The Foot Of The Dr Supports With A Bituminous Emulsion, • The Supply Of The Constituent Elements And The Installation Of Nozzles With Aqueduct Heads If Necessary, • The Execution And Securing Of Excavations, The Creation Of Reinforced Or Unreinforced Concrete Masses As Well As The Landfill Of Excess Materials, • The Supply And Implementation Of Reinforcement, Anchors And Reserve Sleeves, • The Making Cleanliness Slabs (Excluding Pphm), • Manufacturing, Delivery To The Site, Installation And Adjustment Of Vertical Signaling Equipment As Defined In The Project, • Control Operations Prior To Installation Service Of Pphm Carried Out By An Approved External Organization On The Day Of Installation Of The Assembly Concerned. (At The Latest Within 10 Days Following Installation), • The Complete Removal Of Obsolete Assemblies (Panels, Supports, Pphm), • The Razing Or Complete Demolition Of Existing Masses, • The Supply And Implementation Of Temporary Signage In Shoulder Replacing The D30, D40 Or Da30 Type Signs, This Signage Will Be Maintained Until The Permanent Signage Is Completely Installed. • The Supply, Installation And Removal Of Temporary Horizontal Signage (Painting, Prefabricated Strip), Note That Only So-Called “Full” Lines Will Be Paid For. • The Supply And Installation Of New Concrete Retaining Devices Of Type Gba Or Dba, Including Their Concrete Foundation Base, If Applicable, • The Supply And Mi
|