Road Construction Works – Pt Development Services, Ensuring Technical Assistance From The Designer And Execution Of Works Within The Investment Objective: Creation Of Baia Sprie-Chiuzbaia Mobility Corridor. Given That The Subscription Project With The Title Creation Of Mobility Corridor Baia Sprie-Chiuzbaia Obtained Funding Through The Rop, It Is Necessary To Start The Procurement Of Design And Execution Of Works. The Resources Available At The Level Of The Contracting Entity For Carrying Out The Activities In The Stages Of The Procurement Process Are Formed By The Employees Of The City Of Baia Sprie, The Designer Of The Work And The Provider Of Consulting Services In Public Procurement. Through The Feasibility Study, It Is Proposed To Modernize The Municipal Road Section Dc 5 Baia Sprie - Chiuzbaia Between Km 0+000 - Km 6+900, Respectively The Intersection With Dn 18 Up To The Intersection With Strada Poca. At The Moment, The Proposed Road Section Is In A Precarious State. Taking Into Account The Continuous Development Of Cities And, At The Same Time, The Adjacent Areas, This Project Aims To Create Favorable Conditions For People, Creating Alternative Travel Possibilities Both On Foot And By Means Of Public Transport. The Full Description Of The Works Can Be Found In The Feasibility Study Related To The Purchase, Part Of This Award Documentation. The Characteristics Regarding The Quality And Performance Level For Those Described Are Those Presented In The Related Feasibility Study. The Total Estimated Value Is 59,202,308.38 Lei Without Vat, Of Which: 1.2 Development Of The Land 100,000.00 1.3 Developments For The Protection Of The Environment And Bringing The Land To Its Initial State 400,000.00 1.4 Expenses For The Relocation/Protection Of Utilities 615,000.00 2 Expenses For Securing The Utilities 268,169.72 3.5.4 Daaa 0 3.5.6 Technical Project And Execution Details 860,000.00 3.8.1 Technical Assistance From The Designer 270,000.00 4.1 Constructions And Installations 54,715,701.07 4.2 Installation Of Machinery, Technological And Functional Equipment 0.00 4.3 Machinery, Technological And Functional Equipment That Requires Assembly 0.00 4.4 Machinery, Technological And Functional Equipment That Does Not Require Assembly And Transport Equipment 0.00 5.1 Site Organization 1,933,437.59 6.1 Training Of Operating Personnel 5,000.00 6.2 Technological Samples 35,000.00 Total 59,202,308.38 Design Services And Technical Assistance 1,130,000.00 Execution Of Works 58,072,308.38
|