Construction Work – Civil Engineering, Road Construction And Canal Construction Work. The Plan Is To Build A Fire And Rescue Station With A Shed For Emergency Vehicles From The Hamburg Professional Fire Department. For This Purpose, A Building With A Gross Floor Area Of 5,600 M² And Dimensions Of Up To 95 X 40 M As Well As A 22 M High Training Tower Will Be Built. A Small Playing Field And Parking Spaces Are Also Planned. The Property Area Covers A Size Of ~ 14,000 M². The Construction Site Is Located In Hh-Finkenwerder On Aluminum Street Between A Gas Station To The North And The Aluminum Works To The South, Whose Conveyor Bridge Spans The Property To The East. Access To Aluminumstrasse Is Via Finkenwerder Strasse. There Are No Connections To The Drain Network For Rainwater And Wastewater Disposal. All Wastewater Is Cleaned Using Wastewater Systems And Seeped Away On The Property. As Part Of The Construction Site Clearance, 1St Construction Phase, The Underground Pipes Under And Around The Building, An Asphalt Construction Road As Well As Material And Construction Site Facilities Areas With A Gravel Base Layer Were Constructed. // The Construction Project Includes Civil Engineering, Road Construction And Canal Construction Work, 2Nd Construction Phase, For The Production Of The Cables. // Essential Work: The 2Nd Construction Phase Includes The Construction Of Wastewater Systems For Lifting, Pumping And Cleaning The Wastewater With 1 Coalescence Separator, 1 Sampling Shaft, 2 Double Pumping Stations, 2 Pressure Relief Shafts, A Small Sewage Treatment Plant For 28 Population Values And A 1 Washing Area With 60 M² According To Lau Switching Shaft. The Underground Cable Engineering Work Includes Cable Conduit Routes Dn 50 – 150 With Cable Pulling Shafts For Electricity, Lighting And Communication As Well As Foundations For Several E-Charging Stations. 5,000 M² Paved Traffic Facilities With 1,000 M Of Edging Made Of High, Low, Round And Angled Curbs. The Earthworks For Creating The Surrounding Infiltration Troughs For The Infiltration Of Rainwater. The Construction Of 2 Access Routes With Barriers, Doors And Fences, Street Lighting With 8 - 14 M High Masts, The Equipment With 10 Garbage And Hazardous Material Boxes, 1 Closed Bicycle Shelter With 18 Bicycle Support Bars, 40 Bollards As Collision Protection At Gates And Building Corners. Execution Of The Earthworks For The Utilization Of Approx. 2,000 M3 Of Sandy Excavated Soil And For The Construction Pits With Dewatering For The Wastewater Systems.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88868792
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.